Skip to main content

Long commute

A massive traffic jam was the result in Delhi following the closure of a toll station on the NH-8 highway connecting with Gurgaon. Up to 26 lanes of traffic ground to a halt when the jam hit its peak, with vehicles stalled along the route in either direction. The cause of the problem was the removal of a 32 lane tolling plaza. Rather than cutting congestion as expected, removing the toll plaza resulted in the jam appearing elsewhere along the highway.
January 19, 2016 Read time: 1 min
A massive traffic jam was the result in Delhi following the closure of a toll station on the NH-8 highway connecting with Gurgaon. Up to 26 lanes of traffic ground to a halt when the jam hit its peak, with vehicles stalled along the route in either direction. The cause of the problem was the removal of a 32 lane tolling plaza. Rather than cutting congestion as expected, removing the toll plaza resulted in the jam appearing elsewhere along the highway.

Related Content

  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.
  • Nairobi expressway construction now underway
    October 25, 2019
    Construction work has now commenced on the new expressway route through Kenya’s congested capital, Nairobi. The project has been delayed for nearly a decade but building of the link is now going ahead, an important move in reducing traffic jams in the city. The route will have two traffic lanes in either direction and will feature 10 interchanges, with a considerable portion of the expressway being elevated. It will provide an important connection between the A109 Nairobi to Mombasa route and A104 Nairobi
  • UK’s controversial Stonehenge Bypass tunnel to go ahead
    February 21, 2024
    The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the