Skip to main content

Long commute

A massive traffic jam was the result in Delhi following the closure of a toll station on the NH-8 highway connecting with Gurgaon. Up to 26 lanes of traffic ground to a halt when the jam hit its peak, with vehicles stalled along the route in either direction. The cause of the problem was the removal of a 32 lane tolling plaza. Rather than cutting congestion as expected, removing the toll plaza resulted in the jam appearing elsewhere along the highway.
January 19, 2016 Read time: 1 min
A massive traffic jam was the result in Delhi following the closure of a toll station on the NH-8 highway connecting with Gurgaon. Up to 26 lanes of traffic ground to a halt when the jam hit its peak, with vehicles stalled along the route in either direction. The cause of the problem was the removal of a 32 lane tolling plaza. Rather than cutting congestion as expected, removing the toll plaza resulted in the jam appearing elsewhere along the highway.

Related Content

  • Fast repair for key Cairo road
    July 14, 2015
    Fast repair of Cairo’s busy urban highway has been achieved using paving equipment. And MOBA levelling technology played an important role in ensuring finish quality met requirements. Cairo is Egypt’s fast-growing capital city, with an estimated population of around 20 million living in its catchment area. The city’s fast growth rate however has placed enormous demands on its infrastructure, with transportation creaking under the strain. An increasing numbers of people use the roads in and around Cairo ev
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Ascendi updates Portugal toll plazas
    July 1, 2022
    Almost 200 lanes have been equipped with front and rear OCR Tattile Basic ANPR cameras
  • $3.2 billion express lanes contract for North Carolina
    July 1, 2025
    A $3.2 billion express lanes contract is opening for bids in North Carolina.