Skip to main content

London swings with SwiftGates

England’s National Highways agency has installed the swinging SwiftGate barrier system, made by Versilis, at the A3 Hindhead Tunnel just outside London
April 15, 2022 Read time: 2 mins
Versilis’s SwiftGates will be operating for the 1.83km Hindhead Tunnel

SwiftGate is a series of swing gates which automatically close off lanes in only minutes and saves road workers having to put out cones in the face of oncoming traffic.

National Highways said SwiftGate can be fully deployed in around five minutes compared to the 25 minutes it takes road workers to put out the taper of cones directing often fast-moving traffic away from a live lane.

The A3 Hindhead Tunnel in county Surrey requires regular closures for essential maintenance work. During 2019 there were 14 vehicle incursions into these roadworks putting the lives of workers at risk.

The trial on the north and southbound carriageways of the tunnel is being set up with cooperation between National Highways and its maintenance contractors Kier and Highway Care. The gates clearly and safely filter traffic out of the traffic lane. Cones can then be put out beyond the taper to clearly mark out the closed-off lane. As well as avoiding the need for workers to manually set out tapers, the arms are a strong visual deterrent which will help avoid incursions, particularly at night-time.

The announcement regarding SwiftGate follows successful trials of an automated cone laying machine by National Highways, Highway Care and Kier. The Falcon ACLM vehicle puts out and retrieves cones, avoiding the need for a two-man team to lift and drop cones from the back of a moving vehicle. A second automated cone laying machine being developed by King Highway Products through the National Highways’ innovation fund is due to undergo further off-road testing shortly.

National Highways - the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads - has a ringfenced Innovation and Modernisation Fund to help maximise the opportunities offered by technologies such as automated vehicles. It is part of National Highways’ Digital Roads 2025 vision which the agency said will fundamentally change how England’s roads are designed, built, operated and used. 

For more information on companies in this article

Related Content

  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.
  • London’s transportation network requires revolutionary approach to build capacity
    November 13, 2015
    London requires a radical new strategy to delivering the transportation development the city will need to cope with its fast growing population. Martin Tugwell, Transport Programme Director for England’s Economic Heartland Strategic Alliance said, “A road network fit for the world’s fifth largest economy cannot be planned from London: it is time for a revolution in approach, one that is focused on meeting our needs.”
  • Colas drives measures to improve safety in Area 7 workzones
    December 11, 2015
    A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought