Skip to main content

Lithuanian speed merchant

A Lithuanian man sparked an international police pursuit when he stole a BMW X6 car in Bavaria. The car thief hit speeds of 240km/h in the high performance car as he attempted to elude pursuit, with German police using no less than seven patrol vehicles to try and stop the stolen car. The thief headed towards the nearby German border with the Czech Republic, where Czech police had been alerted and then took over the pursuit, enlisting the use of a helicopter. When the stolen car ran out of fuel the driver a
January 14, 2015 Read time: 1 min
A Lithuanian man sparked an international police pursuit when he stole a BMW X6 car in Bavaria. The car thief hit speeds of 240km/h in the high performance car as he attempted to elude pursuit, with German police using no less than seven patrol vehicles to try and stop the stolen car. The thief headed towards the nearby German border with the Czech Republic, where Czech police had been alerted and then took over the pursuit, enlisting the use of a helicopter. When the stolen car ran out of fuel the driver abandoned it near a village and ran away but Czech police monitored his movements with the helicopter and were soon able to track him down and arrest him.

Related Content

  • Wrong time to end right turns?
    March 15, 2024
    Banning right-hand turns after stopping for a red light is gaining momentum in the US. But debate continues about whether it will result in fewer incidents between vehicles and alternative mobility users. David Arminas reports.
  • Digital opportunities: Eurasphalt & Eurobitume (E&E) event, Berlin
    July 3, 2018
    Traditional players in the European bitumen sector need to grasp digital technology in all its forms to survive. Kristina Smith reports from the recent E&E conference in Berlin.
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.