Skip to main content

Lightweight drain covers reduce risk of theft

With scrap metal prices soaring, some European countries are suffering from a spate of drain cover thefts. Serious safety issues arise for road users of all categories as a result of drain cover theft, with utility companies and local councils being left with the additional burden of replacing stolen ductile ironwork. However Ultracrete, part of the Instarmac Group, has a solution in the shape of its recently launched coverTEC range of pedestrian and road composite manhole covers and frames. These lightweig
March 2, 2012 Read time: 2 mins

With scrap metal prices soaring, some European countries are suffering from a spate of drain cover thefts.

Serious safety issues arise for road users of all categories as a result of drain cover theft, with utility companies and local councils being left with the additional burden of replacing stolen ductile ironwork.

However 2492 Ultracrete, part of the 240 Instarmac Group, has a solution in the shape of its recently launched coverTEC range of pedestrian and road composite manhole covers and frames. These lightweight and durable products can take the place of conventional ductile ironwork and eliminate the problem of theft.

The composite covers offer other benefits too as their light weight reduces handling requirements and the risk of installation injuries for personnel, while they also offer improved anti-skid performance.

This last feature is of particular importance to vulnerable road users such as motorcyclists and cyclists, who are at risk during periods of wet or cold weather from conventional iron covers installed in the roadway.

The Ultracrete coverTEC products meet European requirements and the range includes covers and frames. The covers are made from an advanced composite structure of glass fibre and resin, so they are light in weight as well as providing a durable and a safe alternative to conventional ironwork. These composite covers have no scrap value, eliminating the theft problem prevalent in some countries. The covers are also approved by various motorcycling and cycling bodies as a safer alternative to conventional iron products. The coverTEC manhole covers and frames can be used with Ultracrete's range of highway maintenance products and can be installed using the firm's approved reinstatement system. This provides a five year service life guarantee while the fast installation means that a road can be open to traffic within the hour. The new coverTEC range has already been used and trialled across the UK and offers a reduction in replacement costs.

For more information on companies in this article

Related Content

  • Reduced emissions, costs, with recycled asphalt
    February 21, 2012
    Recycling is a key issue for asphalt road construction, with many technologies now coming to market. Bith an ever increasing emphasis on sustainability forcing change in the construction sector in Europe and North America, the highway sector now has to seek new solutions.
  • Europe’s road safety targets at risk
    July 10, 2015
    This new analysis has been published by the European Transport Safety Council (ETSC). According to the ETSC data, 2014 showed the lowest annual reduction in EU road deaths since 2001. In all 25,845 people were killed in road crashes in the 28 nations of the EU during 2014. This represented a decrease of just 0.6% compared to 2013. EU member states now need to cut deaths by almost 8% each year until 2020 to meet the target set in 2010 to halve deaths within a decade.
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.