Skip to main content

Liebherr’s truck-mounted 37 Z4 XXT concrete pump

A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
February 19, 2015 Read time: 2 mins
The Liebherr truck-mounted concrete pump 37 Z4 XXT in operation
A truck-mounted concrete pump configured in four sections, 718 Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site.

The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the length of the distributor boom. To minimise the necessity of stockpiling different wear parts, Liebherr predominantly use pipe bends of the same type. Numerous special design details facilitate the replacement of wear parts and optimise servicing.

Liebherr’s patented XXT-narrow support is extremely sturdy and torsionally-resistant. The German firm says it is the only manufacturer on the market to offer this innovative system. The front and rear outriggers are secured directly to the boom pedestal of the distributor boom, whereby the forces are channelled directly into the supports from the boom, without deviation. All four outriggers are pivot-mounted, allowing maximum flexibility and a particularly extensive working range of the distributor boom with narrow supports. This can prove to be a decisive advantage on building sites with restricted access.

The 37 Z4 XXT is equipped with high-performance pump units in three different output sizes, in accordance with respective customer requirements. Liebherr offer pump units featuring maximum flow rates of 125m³/h, 138m³/h and 163m³/h. These powerful Liebherr pump units are renowned for their distinctive smooth running. Smooth changeover of the S-pipe is facilitated by the hydraulic cylinder with end-of-stroke damping.

Chassis from various truck manufacturers may be selected by the customer as an underbody for the truck-mounted concrete pump.

Liebherr offers an extensive range of optional accessories and equipment for the 37 Z4 XXT. This includes, among others, extra storage compartments, an additional diesel tank or an auxiliary access point on the left-hand side to suit all respective customer requirements. A magnetic rotating beacon ensures extra safety and a pneumatic end hose pinch valve prevents continued discharge of the concrete when repositioning the boom.

For more information on companies in this article

Related Content

  • BOMAG’s latest stabilisers: RS 250 and RS 300
    May 19, 2022
    Tractor-towed stabilisers are a new addition to BOMAG's product range – the RS 250 and RS 300.
  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • Sykes Pumps ballasting expertise adds weight to Forth float-outs
    June 17, 2016
    UK hire specialist, Sykes Pumps, is playing a vital role in delivering Scotland’s biggest transport infrastructure project in a generation - The Forth Replacement Crossing (FRC). Once completed later this year, the new road bridge will be the longest three-tower cable-stayed bridge in the world. Forth Crossing Bridge Constructors (FCBC) consortium is using 42,000 tonnes of steel. Getting all that steel out into the Firth of Forth is a delicate operation. The project involves transferring 7,000tonne se
  • Versatile demolition machine from Doosan
    January 25, 2022
    Doosan Infracore is offering its DX380DM-7, the third model in the firm’s high reach demolition excavator range. The machine joins the existing DX235DM and DX530DM models launched last year.