Skip to main content

Liebherr’s truck-mounted 37 Z4 XXT concrete pump

A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
February 19, 2015 Read time: 2 mins
The Liebherr truck-mounted concrete pump 37 Z4 XXT in operation
A truck-mounted concrete pump configured in four sections, 718 Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site.

The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the length of the distributor boom. To minimise the necessity of stockpiling different wear parts, Liebherr predominantly use pipe bends of the same type. Numerous special design details facilitate the replacement of wear parts and optimise servicing.

Liebherr’s patented XXT-narrow support is extremely sturdy and torsionally-resistant. The German firm says it is the only manufacturer on the market to offer this innovative system. The front and rear outriggers are secured directly to the boom pedestal of the distributor boom, whereby the forces are channelled directly into the supports from the boom, without deviation. All four outriggers are pivot-mounted, allowing maximum flexibility and a particularly extensive working range of the distributor boom with narrow supports. This can prove to be a decisive advantage on building sites with restricted access.

The 37 Z4 XXT is equipped with high-performance pump units in three different output sizes, in accordance with respective customer requirements. Liebherr offer pump units featuring maximum flow rates of 125m³/h, 138m³/h and 163m³/h. These powerful Liebherr pump units are renowned for their distinctive smooth running. Smooth changeover of the S-pipe is facilitated by the hydraulic cylinder with end-of-stroke damping.

Chassis from various truck manufacturers may be selected by the customer as an underbody for the truck-mounted concrete pump.

Liebherr offers an extensive range of optional accessories and equipment for the 37 Z4 XXT. This includes, among others, extra storage compartments, an additional diesel tank or an auxiliary access point on the left-hand side to suit all respective customer requirements. A magnetic rotating beacon ensures extra safety and a pneumatic end hose pinch valve prevents continued discharge of the concrete when repositioning the boom.

For more information on companies in this article

Related Content

  • Toggenburger takes two Terex cranes to tackle a Swiss tandem lift
    August 21, 2015
    Two of the largest cranes in Switzerland recently were called upon to lift an 884tonne, 162m-long connecting bridge between two buildings at the Coop distribution centre in Schafisheim. “The individual bridge components had enormous gross weights of up to 275tonnes and required us to use working radii of up to 29m,” said Andre Huber, project manager at Toggenburger, the company that took on the task. To get the job done, Toggenburger rolled out its biggest machinery which also happen to be the two lar
  • Concrete drilling made E-Z
    November 29, 2012
    E-Z Drill is now introducing its Model 210 Equipment-Mounted concrete drill attachment series. Consisting of three models: the three-gang Model 210-3 EQ MT, four-gang Model 210-4 EQ MT and five-gang Model 210-5 EQ MT, the range is said to be compatible with most backhoe loaders and excavators. The pneumatic drills are said to deliver high productivity and lower maintenance needs, suiting them to full-depth road repair and patching projects. A control panel is mounted on the drill and the units are capable
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.