Skip to main content

Liebherr’s Austrian pit stop

Liebherr’s duty cycle crawler crane was used by a specialist dredging company for dragline application work in Austria. Kiesabbau Wiedemann used the HS 845 HD to extract gravel from the gravel pit of the ARGE S 33 joint venture in Grafenwörth near Vienna. Using the dredging method around 200,000m³ of gravel and sand were extracted, temporarily stored and then loaded for further transportation. Equipped with a powerful 350kW/469 hp six-cylinder diesel engine, Liebherr says the durable steel structure of its
May 3, 2012 Read time: 2 mins
Liebherr says by using its HS 845 crawler crane, Kiesabbu wedmann was able to meet its project deadline in Grafenworth whilst lowering fuel consumption.
718 Liebherr’s duty cycle crawler crane was used by a specialist dredging company for dragline application work in Austria.

Kiesabbau Wiedemann used the HS 845 HD to extract gravel from the gravel pit of the 2841 ARGE S 33 joint venture in Grafenwörth near Vienna. Using the dredging method around 200,000m³ of gravel and sand were extracted, temporarily stored and then loaded for further transportation.

Equipped with a powerful 350kW/469 hp six-cylinder diesel engine, Liebherr says the durable steel structure of its HS 845 HD crawler crane provides ideal conditions for the heavy duty dragline application. The company’s Litronic control system, based on CANBUS technology, incorporates all control and monitoring functions in the HS 845 HD. According to Liebherr, this  allows the machine to work reliably at extreme temperatures or humid conditions.

Additionally, the crawler crane’s electrohydraulic continuous proportional is said to enable precise and simultaneous crane movements, which are vital for dragline applications. A second swing drive increases swing torque resulting in short swing and fast loading cycles. The machine’s Interlock control system allows power lowering of the grab line when raising the dragline bucket with the hoist rope, saving energy and prolonging the working life of the hoist rope.

For more information on companies in this article

Related Content

  • Sennebogen’s Algiers bridge
    January 21, 2013
    The Algerian SAPTA construction company, who specialise in road and traffic infrastructure construction, is using a Sennebogen 2200 crawler crane to assist with their commission to build a bridge in Algiers. Sennebogen service and sales partner EURL SM Maintenance delivered the 2200 crawler crane to SAPTA in July this year. It has since been set to work lifting, piece by piece, the steel support for the 600m long Algiers-based bridge. The crane will also be used for a range of other lifting tasks required a
  • Intelligent bulldozers provide productivity boost
    September 27, 2013
    New smart dozers provide faster working and greater efficiency - Mike Woof reports Both Caterpillar and Komatsu are making key moves in offering intelligent bulldozing capabilities on their latest machines. In the medium-sized bulldozer market, both companies have sophisticated new models that will increase both productivity and finish quality, while lowering running costs for the user.
  • All aboard the Wirtgen paving train on Germany’s A7 project
    February 21, 2019
    The A7 is being widened between Hamburg and Bordesholm from four lanes to six - in some places to eight - to ensure the motorway remains an efficient traffic artery. The aim is to create a pavement with a high degree of driving comfort but which withstands the loads of heavy-goods traffic. For widening the 60km stretch in the Schleswig-Holstein region, consortium Via Solutions Nord and joint venture ARGE A7 Hamburg-Bordesholm opted for steel reinforced concrete paving with an exposed aggregate concrete s
  • JCB unveils new six cylinder JCB Dieselmax 672 engine
    June 7, 2013
    JCB has announced plans to start production of six-cylinder engines with the addition of the JCB Dieselmax 672 to its world renowned engine line-up. In just over eight years JCB has gone from a new entrant to engine manufacturing to a major global producer with a reputation for fuel efficiency and innovation. The first engine rolled off the production line in the UK in November 2004 and since then production has also extended to JCB India’s HQ at Ballabgarh, where the first engine was manufactured in 2011.