Skip to main content

Liebherr’s Austrian pit stop

Liebherr’s duty cycle crawler crane was used by a specialist dredging company for dragline application work in Austria. Kiesabbau Wiedemann used the HS 845 HD to extract gravel from the gravel pit of the ARGE S 33 joint venture in Grafenwörth near Vienna. Using the dredging method around 200,000m³ of gravel and sand were extracted, temporarily stored and then loaded for further transportation. Equipped with a powerful 350kW/469 hp six-cylinder diesel engine, Liebherr says the durable steel structure of its
May 3, 2012 Read time: 2 mins
Liebherr says by using its HS 845 crawler crane, Kiesabbu wedmann was able to meet its project deadline in Grafenworth whilst lowering fuel consumption.
718 Liebherr’s duty cycle crawler crane was used by a specialist dredging company for dragline application work in Austria.

Kiesabbau Wiedemann used the HS 845 HD to extract gravel from the gravel pit of the 2841 ARGE S 33 joint venture in Grafenwörth near Vienna. Using the dredging method around 200,000m³ of gravel and sand were extracted, temporarily stored and then loaded for further transportation.

Equipped with a powerful 350kW/469 hp six-cylinder diesel engine, Liebherr says the durable steel structure of its HS 845 HD crawler crane provides ideal conditions for the heavy duty dragline application. The company’s Litronic control system, based on CANBUS technology, incorporates all control and monitoring functions in the HS 845 HD. According to Liebherr, this  allows the machine to work reliably at extreme temperatures or humid conditions.

Additionally, the crawler crane’s electrohydraulic continuous proportional is said to enable precise and simultaneous crane movements, which are vital for dragline applications. A second swing drive increases swing torque resulting in short swing and fast loading cycles. The machine’s Interlock control system allows power lowering of the grab line when raising the dragline bucket with the hoist rope, saving energy and prolonging the working life of the hoist rope.

For more information on companies in this article

Related Content

  • New asphalt paving innovations from around the globe
    January 19, 2018
    Asphalt paving equipment manufacturers from around the globe are rolling out new and improved machines - Mike Woof writes The pace of development within asphalt paving technology is quick, with new machines being unveiled all around the world. Machine manufacturers in Europe, China and Japan have been re ning and developing their technologies, which are aimed at differing global markets.
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • LiuGong has major plans for future corporate development
    December 10, 2015
    LiuGong unveiled new machines as well as its plans for the future at the BICES 2015 construction equipment show in Beijing recently. Trading conditions are tough in China at the moment, but LiuGong is performing better financially than many of its local rivals according to the firm. LiuGong’s vice-president, Dave Beatenbough said that the firm is particularly well known for its wheeled loaders, a product line for which the firm is a market leader in China. However, he explained that the company is actively
  • Buckets of innovation
    January 6, 2017
    The lower angle of Caterpillar Work Tools’ new line of buckets for the E-series Hydraulic Excavators are said to concentrate the power of the machine across a smaller surface, offering less resistance to the material flow into and around the bucket resulting in a smoother and faster dig cycle. In addition, ‘Tip forward’ - the tip position that opens up the mouth of the bucket and lengthens the floor - has been moved towards the operator. This is said to improve both material flow into the bucket and visibi