Skip to main content

Liebherr’s 47 M5 XXT Truck-Mounted Concrete Pump

Liebherr claims its updated 47 M5 XXT truck-mounted concrete pump offers added customer value. In-house development and optimisation of the mast is said to have been at the forefront of the latest model version. An array of other new design features will, says Liebherr, simplify the replacement of wear parts for more efficient servicing.
December 4, 2013 Read time: 3 mins
Liebherr 47 M5 XXT Truck-Mounted Concrete Pump
Liebherr claims its updated 47 M5 XXT truck-mounted concrete pump offers added customer value. In-house development and optimisation of the mast is said to have been at the forefront of the latest model version. An array of other new design features will, says Liebherr, simplify the replacement of wear parts for more efficient servicing.

The 47 M5 XXT pump’s new 47m, five-section multi-fold distributor boom is said to be extremely torsion-resistant, ensuring that vibrations are reduced to an absolute minimum when unfolding the boom on the building site. To ensure a balanced weight distribution, the concrete pipeline is configured close to the boom on both left- and right-hand sides. Minimal pressure loss over the entire length of the distributor boom is guaranteed by the pipe bend in the concrete pipeline featuring a radius of 275mm.

Moreover, the pipe bends used are predominantly of the same type, minimising required storage of various wear parts. As a whole, the compact boom package – with no overhang at the rear of the vehicle chassis – in correlation with the truck-mounted concrete pump design, lends the overall vehicle an articulate and tidily-arranged appearance.

Patent protected, and therefore said to be the only one of its kind available on the market, 718 Liebherr's XXT narrow support is low torsion and extremely robust. The front and rear outriggers are secured directly onto the boom pedestal of the distributor boom, ensuring that all forces bypass the boom completely and are channelled directly into the outriggers. Four pivoting outriggers guarantee maximum flexibility and an extremely wide swing range of the distributor boom when supporting in a narrow configuration. This can prove decisive when working on building sites with restricted access.

The truck-mounted 47 M5 XXT can be equipped with two high-pressure pump units featuring varying performance outputs. Pump unit 140HL conveys up to 140 m³/h concrete, whereas the 160HL is capable of up to 160 m³/h concrete.  Depending on respective customer requirements, the 47 M5 XXT can be arranged on a four-axle chassis from selected manufacturers, including MAN or Mercedes.

A wide range of optional accessories and equipment is available for the 47 M5 XXT. This allows the customer to opt for extra storage compartments, for example, or a second diesel tank or an additional access point on the left-hand side of the vehicle. A magnetic rotating flash provides added safety and a pneumatic pinch valve on the end hose prevents concrete spillage when repositioning the boom.

For more information on companies in this article

Related Content

  • Machine Control sector is the place for acquisitions
    January 22, 2014
    The machine control sector has been lively in recent months with a major acquisition, the unveiling of new software innovation and landmark testing of new technology to monitor paving temperature. Guy Woodford reports The state road construction authority in the German state of Saxony-Anhalt (LSBB Saxony-Anhalt) has become the first nationally to test MOBA’s new PAVE-IR Scan temperature measurement system at a works site.
  • Concrete repair solution for tunnel applications
    April 12, 2012
    Blastcrete Equipment Company says that its novel new Mason Mate system provides an innovative solution for concrete repair and shotcreting in tunnelling applications.
  • MB demolishes the opposition
    July 7, 2025
    MB’s new demolition pulverisers – the MB-P and MB-PT demolition series - are the result of years of in-house development, extreme on-site testing and listening to the real needs of those on the ground. The result is a comprehensive range for every job - primary demolition, secondary demolition, material downsizing and metal cutting.
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s