Skip to main content

Liebherr unveils THS 110 D-K crawler concrete pump

Introducing its new THS 110 D-K crawler concrete pump, Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine. The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control. The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour. Liebherr says the during the design phase it
April 10, 2018 Read time: 2 mins
The concrete pump is moved and controlled via a radio remote control

Introducing its new THS 110 D-K crawler concrete pump, 718 Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine.

The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control.

The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour.

Liebherr says the during the design phase it was ensured that wear parts for the THS 110 D-K pump could be quickly and easily replaced.

The pump‘s extensive standard scope of delivery includes, for example, a 500litre water tank with water pump and a lockable toolbox, and the unit is said to be well-suited to site work that involves frequent relocation around the construction site.

A typical application for crawler concrete pumps is providing drilling rigs with concrete to fill bored piling foundations.

For more information on companies in this article

Related Content

  • Xylem pumps
    December 14, 2017
    Among the many suppliers working on Pennsylvania’s rapid bridge replacement project is pump specialist Xylem which has sold and rented a variety of pumps to lead contractor Walsh/Granite and some of the 45 sub-contractors also carrying out the works. “The scale of the project – to complete over 550 bridge upgrades within an ambitious timeline – demanded a reliable dewatering partner who could provide a broad range of dewatering solutions to meet diverse, often complex, pumping requirements,” said Stan Rock
  • Sandvik DC125R is new member of DC hammer drill family
    January 6, 2017
    Sandvik DC125R is a new member to the proven Sandvik DC family of compact, rubber-tyred top hammer drill rigs. The fully remote-controlled, hydraulic and self-propelled mini-sized drilling unit on a four-wheel drive carrier, is for drilling 22–45mm holes, and replaces the former Sandvik DC122R, one in the series of rigs originally launched in 1988 under the product name of Tamrock Commando. “A range of job site tests show that the new model offers better manoeuvrability than ever before. This is thanks to t
  • Binding and sealing options for road construction
    August 11, 2023
    An array of new solutions is available from key manufacturers for binder and chipsealing applications.
  • Engine manufacturers meeting emissions deadlines
    February 10, 2012
    Engine manufacturers have had to jump through regulatory hoops in recent years, meeting requirements for diesels with ever cleaner exhaust emissions. When this programme was first proposed, many believed the final aims could not be achieved. However on January 1st 2011, the Tier 4 Interim/Stage IIIB emissions regulations will come into force in North America and Europe and all the major diesel manufacturers will have suitable products at the ready. The Tier 4 Interim/Stage IIIB emissions regulations require