Skip to main content

Liebherr unveils THS 110 D-K crawler concrete pump

Introducing its new THS 110 D-K crawler concrete pump, Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine. The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control. The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour. Liebherr says the during the design phase it
April 10, 2018 Read time: 2 mins
The concrete pump is moved and controlled via a radio remote control

Introducing its new THS 110 D-K crawler concrete pump, 718 Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine.

The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control.

The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour.

Liebherr says the during the design phase it was ensured that wear parts for the THS 110 D-K pump could be quickly and easily replaced.

The pump‘s extensive standard scope of delivery includes, for example, a 500litre water tank with water pump and a lockable toolbox, and the unit is said to be well-suited to site work that involves frequent relocation around the construction site.

A typical application for crawler concrete pumps is providing drilling rigs with concrete to fill bored piling foundations.

For more information on companies in this article

Related Content

  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Concrete plant efficiency with new machines
    August 14, 2019
    New technology for concrete production will help boost efficiency New advances in concrete plant technology will help boost materials quality for users. The latest machines are more versatile and more productive than previous generation equipment. Ease of transport and fast assembly/disassembly and commissioning are other important factors for the latest plants. Research and development is an important issue for all manufacturers in the segment. With Liebherr for example having two new laboratory mixe
  • Liebherr’s R 946 is firm’s first Stage IV crawler excavator
    January 6, 2017
    Liebherr’s new R 946 model is its first crawler excavator to meet the stage IV/ Tier 4f emissions standards. The new R 946 has an operating weight of around 40tonnes. The crawler excavator’s new six-cylinder Liebherr engine delivers 200 kW and integrates a new stage IV/ Tier 4f exhaust gas treatment system. This features a selective catalytic reduction (SCR) system using urea injection to post-treat exhaust gases.