Skip to main content

Liebherr unveils THS 110 D-K crawler concrete pump

Introducing its new THS 110 D-K crawler concrete pump, Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine. The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control. The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour. Liebherr says the during the design phase it
April 10, 2018 Read time: 2 mins
The concrete pump is moved and controlled via a radio remote control

Introducing its new THS 110 D-K crawler concrete pump, 718 Liebherr says the model offers a maximum delivery rate of 102m³/hour and features a six-cylinder engine.

The concrete pump, which is fitted onto a crawler running gear, is moved and controlled via a radio remote control.

The three models in the series of Liebherr crawler concrete pumps are the THS 80 D-K, the THS 110 D-K and the THS 140 D-K, with maximum delivery rates ranging from 65m³/hour to 135m³/hour.

Liebherr says the during the design phase it was ensured that wear parts for the THS 110 D-K pump could be quickly and easily replaced.

The pump‘s extensive standard scope of delivery includes, for example, a 500litre water tank with water pump and a lockable toolbox, and the unit is said to be well-suited to site work that involves frequent relocation around the construction site.

A typical application for crawler concrete pumps is providing drilling rigs with concrete to fill bored piling foundations.

For more information on companies in this article

Related Content

  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Road construction software innovations
    February 13, 2012
    A range of key software innovations are now available for road construction applications from various suppliers - Adrian Greeman writes. Two significant and highly economic alternatives are now available to the major CAD providers both from Belgium and both offering interesting features. First is Pythagoras, which describes itself as a modern CAD program specially designed for topographical applications which include land surveying, road design and city planning.
  • CDE Global unveils Infinity screen range
    April 14, 2016
    This impressive 1200m2 size of materials washing specialist CDE Global’s stand offers an indication of the company’s global ambition. The firm is launching this week a number of new inclined screens from its Infinity range – which now boasts 14 models. Launched in 2014, the range has undergone a major expansion to include new horizontal sizing screens; grizzly screens; dewatering screen and fine sand screens for specialist applications, in addition to the existing range of inclined screens.