Skip to main content

Liebherr reworks 172 EC-B 8 Litronic flat-top crane

Liebherr’s reworked 172 EC-B 8 Litronic flat-top crane, presented for the first time, has had its jib been extended 2.5m to 62.5m. The crane, which can be supplied with the new 16 EC, 16 HC, 17 HC and 21 HC tower systems, can now hoist 1,800kg at the jib head, and its maximum load capacity is still 8,000kg. The maximum free-standing hook height of the crane remains at 71.4m. The new crane will be presented on the 16 EC tower system alongside the LiUP internal crane driver elevator, which is powered by a
April 9, 2018 Read time: 1 min
Outreach of the Liebherr Litronic flat-top crane is 2.5m longer than its predecessor

718 Liebherr’s reworked 172 EC-B 8 Litronic flat-top crane, presented for the first time, has had its jib been extended 2.5m to 62.5m.

The crane, which can be supplied with the new 16 EC, 16 HC, 17 HC and 21 HC tower systems, can now hoist 1,800kg at the jib head, and its maximum load capacity is still 8,000kg.

The maximum free-standing hook height of the crane remains at 71.4m.

The new crane will be presented on the 16 EC tower system alongside the LiUP internal crane driver elevator, which is powered by a lithium-ion battery with an energy recovery system that is compatible with both the EC and the HC tower systems.

For more information on companies in this article

Related Content

  • New bridge over China’s Yi River
    December 10, 2015
    A new bridge has been built in China that now spans the Yi River. A crane from XCMG has played a key role in the work, being used to erect the two 100m-high towers for the structure. The bridge is made from prestressed concrete and is a cable-stayed structure, with two towers providing support for the necessary cables. Building this large bridge required the use of sophisticated technology and the project team opted to use a 100m-high tower crane to help lift key elements of the structure into place. The c
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • New low emission, versatile asphalt plant from Marini
    February 11, 2013
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
  • Liebherr piling machines on Vietnam road project
    March 7, 2018
    Crucial piling work for the elevated approach to a bridge at Haiphong in Vietnam has been carried out by a Liebherr rig Highly productive and reliable, the Liebherr LB36-410 rig has been used to complete piles for the new bridge link. The machine has had success drilling through waterlogged ground and has helped to keep the project on schedule. Vietnamese ground engineering and foundations specialist contractor, Dua Fat Foundation Joint Stock Company has been using the Liebherr LB 36-410 rotary drillin