Skip to main content

Liebherr demonstrates deep foundation knowledge

At CONEXPO CON/AGG 2017, Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.
March 8, 2017 Read time: 2 mins
Liebherr LRH 600 Piling

At CONEXPO CON/AGG 2017, 718 Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.     

The crawler crane model LR 1300 with attached fixed leader system, serves as the basic machine for the piling rig LRH 600. In this configuration, the rig enables a diverse range of applications including: piling work with a hammer or vibrator, drilling operations with continuous flight auger or down-the-hole hammer, and various soil improvement methods.

The leader elements of the LRH 600 allow quick and easy assembly through the pin connections. Stability is ensured by the lattice boom design and through the kicker, secured via supporting tubes at the boom head. The two compensating cylinders ensure that the leader always remains parallel to the upper carriage, and provide the maximum transmission of the torque.

Inclination and radius can be adjusted using another pair of cylinders. The LRH 600 achieves an effective working length of 164 51 meters and a maximum radius of 15 meters with a fixed leader.

The LRB 355 has been especially equipped with a larger undercarriage for the US market, which increases the machine’s already high level of stability.

Another advantage of the new undercarriage is the minimized transport weight. The jack-up system allows the crawlers to be dismantled, resulting in a transport weight of only 42 US tons (38 tonnes) for the basic machine.

The machine’s parallel kinematics provide for a large operating area. Since all winches are mounted directly on the leader, this allows for a direct view from the operator’s cab to the main winch, and ensures the ropes do not move during leader adjustment.

For more information on companies in this article

Related Content

  • Komatsu launches nextgen Dash 11 loaders
    June 24, 2025
    At the heart of new Dash 11 generation wheeled loaders is a newly developed Komatsu diesel engine.
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • Hitachi’s latest demolition range
    April 7, 2025

    A joint venture between Hitachi and Kiesel Technology builds special application machines for demolition. The machines are made in Germany by KTEG and these include the KTEG 390HR, which is based on a Hitachi ZX350, and equipped with an extendable undercarriage, additional counterweight and tiltable demolition cab. The fixed mounted 23m high-reach boom allows an attachment weight of 3.5tonnes.

  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b