Skip to main content

Liebherr demonstrates deep foundation knowledge

At CONEXPO CON/AGG 2017, Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.
March 8, 2017 Read time: 2 mins
Liebherr LRH 600 Piling

At CONEXPO CON/AGG 2017, 718 Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.     

The crawler crane model LR 1300 with attached fixed leader system, serves as the basic machine for the piling rig LRH 600. In this configuration, the rig enables a diverse range of applications including: piling work with a hammer or vibrator, drilling operations with continuous flight auger or down-the-hole hammer, and various soil improvement methods.

The leader elements of the LRH 600 allow quick and easy assembly through the pin connections. Stability is ensured by the lattice boom design and through the kicker, secured via supporting tubes at the boom head. The two compensating cylinders ensure that the leader always remains parallel to the upper carriage, and provide the maximum transmission of the torque.

Inclination and radius can be adjusted using another pair of cylinders. The LRH 600 achieves an effective working length of 164 51 meters and a maximum radius of 15 meters with a fixed leader.

The LRB 355 has been especially equipped with a larger undercarriage for the US market, which increases the machine’s already high level of stability.

Another advantage of the new undercarriage is the minimized transport weight. The jack-up system allows the crawlers to be dismantled, resulting in a transport weight of only 42 US tons (38 tonnes) for the basic machine.

The machine’s parallel kinematics provide for a large operating area. Since all winches are mounted directly on the leader, this allows for a direct view from the operator’s cab to the main winch, and ensures the ropes do not move during leader adjustment.

For more information on companies in this article

Related Content

  • Sennebogen cranes building new Turkish port facility
    May 10, 2018
    Several crawler cranes from Sennebogen are proving their worth at a port construction site on the banks of the Bosporus in Turkey. Local firm Özüaydin Crane now has six crawler cranes from Sennebogen and has put the machines to use on a major port construction site in Istanbul. The six crawler cranes include two E-series 5500 models and one E-series 3300 model. Both machine types feature a robust Star-Lifter crawler undercarriage.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Piling job at interchange
    February 17, 2012
    Specialist geotechnical contractors, Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich, West Midlands, England, for a Balfour Beatty/Birse joint venture.
  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality