Skip to main content

Liebherr demonstrates deep foundation knowledge

At CONEXPO CON/AGG 2017, Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.
March 8, 2017 Read time: 2 mins
Liebherr LRH 600 Piling

At CONEXPO CON/AGG 2017, 718 Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.     

The crawler crane model LR 1300 with attached fixed leader system, serves as the basic machine for the piling rig LRH 600. In this configuration, the rig enables a diverse range of applications including: piling work with a hammer or vibrator, drilling operations with continuous flight auger or down-the-hole hammer, and various soil improvement methods.

The leader elements of the LRH 600 allow quick and easy assembly through the pin connections. Stability is ensured by the lattice boom design and through the kicker, secured via supporting tubes at the boom head. The two compensating cylinders ensure that the leader always remains parallel to the upper carriage, and provide the maximum transmission of the torque.

Inclination and radius can be adjusted using another pair of cylinders. The LRH 600 achieves an effective working length of 164 51 meters and a maximum radius of 15 meters with a fixed leader.

The LRB 355 has been especially equipped with a larger undercarriage for the US market, which increases the machine’s already high level of stability.

Another advantage of the new undercarriage is the minimized transport weight. The jack-up system allows the crawlers to be dismantled, resulting in a transport weight of only 42 US tons (38 tonnes) for the basic machine.

The machine’s parallel kinematics provide for a large operating area. Since all winches are mounted directly on the leader, this allows for a direct view from the operator’s cab to the main winch, and ensures the ropes do not move during leader adjustment.

For more information on companies in this article

Related Content

  • Bauer’s BG 30, part of the rig manufacturer’s ValueLine platform
    January 6, 2017
    Bauer Maschinen is presenting a new generation of its ValueLine, a medium-sized platform range for bored piles with a diameter of up to 2.5m and a drilling depth of up to 70m. The platform range includes the BG 26 as the lowest priced-model and the larger version, the BG 30. The core element of the medium-sized platform range is the joint BT base carrier, which was entirely designed and constructed by Bauer. The modern and highly functional support does not just score points for its high safety standa
  • Doosan's UK & Ireland first
    November 12, 2012
    Loughran Rock Industries in Armagh, Northern Ireland, has become the first company in Great Britain and Ireland to purchase a Doosan DX700LC 70tonne crawler excavator. The purchase from Doosan dealer Northern Excavators, based at Hillsborough in Northern Ireland, is said to have allowed Loughran Rock to replace two 50tonne excavators while, at the same time, increase production levels. Loughran Rock supplies a wide range of products including concrete aggregates, high PSV materials, rail ballast, drainage m
  • Drilling efficiency
    February 20, 2012
    The latest developments in drilling rigs can help boost efficiency in quarry producion applications - Mike Woof reports
  • Drilling efficiency
    April 13, 2012
    The latest developments in drilling rigs can help boost efficiency in quarry producion applications - Mike Woof reports. Efficient drilling and blasting operations can have a huge impact on production costs in quarrying. Accuracy of hole direction and depth, as well as optimum blast design and explosives use, are critical for efficient blasting work. Ineffective blasting can result in high quantities of fines of low commercial value as well as over-sized material requiring secondary breaking. This impacts o