Skip to main content

Liebherr demonstrates deep foundation knowledge

At CONEXPO CON/AGG 2017, Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.
March 8, 2017 Read time: 2 mins
Liebherr LRH 600 Piling

At CONEXPO CON/AGG 2017, 718 Liebherr is showcasing its range of machines for the deep foundation industry including the piling rig LRH 600 and the piling and drilling rig LRB 355. Both machines have been especially adapted according to US requirements, and are premiering in North America.     

The crawler crane model LR 1300 with attached fixed leader system, serves as the basic machine for the piling rig LRH 600. In this configuration, the rig enables a diverse range of applications including: piling work with a hammer or vibrator, drilling operations with continuous flight auger or down-the-hole hammer, and various soil improvement methods.

The leader elements of the LRH 600 allow quick and easy assembly through the pin connections. Stability is ensured by the lattice boom design and through the kicker, secured via supporting tubes at the boom head. The two compensating cylinders ensure that the leader always remains parallel to the upper carriage, and provide the maximum transmission of the torque.

Inclination and radius can be adjusted using another pair of cylinders. The LRH 600 achieves an effective working length of 164 51 meters and a maximum radius of 15 meters with a fixed leader.

The LRB 355 has been especially equipped with a larger undercarriage for the US market, which increases the machine’s already high level of stability.

Another advantage of the new undercarriage is the minimized transport weight. The jack-up system allows the crawlers to be dismantled, resulting in a transport weight of only 42 US tons (38 tonnes) for the basic machine.

The machine’s parallel kinematics provide for a large operating area. Since all winches are mounted directly on the leader, this allows for a direct view from the operator’s cab to the main winch, and ensures the ropes do not move during leader adjustment.

For more information on companies in this article

Related Content

  • Liebherr’s Austrian pit stop
    May 3, 2012
    Liebherr’s duty cycle crawler crane was used by a specialist dredging company for dragline application work in Austria. Kiesabbau Wiedemann used the HS 845 HD to extract gravel from the gravel pit of the ARGE S 33 joint venture in Grafenwörth near Vienna. Using the dredging method around 200,000m³ of gravel and sand were extracted, temporarily stored and then loaded for further transportation. Equipped with a powerful 350kW/469 hp six-cylinder diesel engine, Liebherr says the durable steel structure of its
  • EC530E and EC550E – the 50-ton excavators with ideas above their size class
    October 1, 2021
    All-new machines are also a new size class for Volvo CE, offering a 25% boost in fuel efficiency and a range of advanced features to also deliver a 20% boost in productivity
  • Piling productively with Soilmec
    November 27, 2020
    A project in Frankfurt, Germany has benefited from the use of a piling rig supplied by Soilmec. The SR-125 HIT unit has been employed in an application requiring it to drive segmental casing in challenging site conditions.
  • Crane versatility helps with bridge building
    August 14, 2014
    The versatility and mobility of a Terex crawler crane has helped enormously with the construction of a new road bridge in Luxemburg. The Terex Superlift 3800 lattice boom crawler crane owned by Trier-based Steil Kranarbeiten was used to build a bridge in Luxemburg only two days after the same machine was used on a job in the Hunsrück mountain range. The machine was needed to lift a 440m long bridge across a valley, connecting a new section of highway.