Skip to main content

Kramer goes all electric for its new wheel loader 5055e

Kramer, part of the Wacker Neuson Group, will start deliveries of its fully electric wheel loader 5055e starting this summer. Charge time for the 1.2tonne lead-acid battery system is between three and six hours, depending on the work at hand. Its small size - 0.55m³ bucket capacity – and zero emission performance makes it suitable for close-quarters work, including road tunnel applications.
April 13, 2016 Read time: 1 min
The all-electric 5055e from Kramer

8402 Kramer-Werke, part of the 1651 Wacker Neuson Group, will start deliveries of its fully electric wheel loader 5055e starting this summer.

Charge time for the 1.2tonne lead-acid battery system is between three and six hours, depending on the work at hand.

Its small size - 0.55m³ bucket capacity – and zero emission performance makes it suitable for close-quarters work, including road tunnel applications.

The initially high investment costs are offset by significantly lower maintenance costs. Maintenance periods are shorter because none is needed for the engine.

Two electric motors were installed for this purpose: one for the work hydraulics and one for the drive system. Depending on the application of the wheel loader, the power is demanded from the corresponding motor.

This helps to keep the energy consumption as low as possible.

For more information on companies in this article

Related Content

  • Electric retrofit kit for machines from Moog
    April 18, 2024
    The package consists of the ZQuip batteries, an electric motor, a smart controller and a thermal unit to optimise battery temperature.
  • Volvo CE’s Carl Slotte explains the division’s current line-up
    October 11, 2017
    Next year Volvo CE will be testing electric, hybrid and autonomous vehicles in a quarry. Carl Slotte, head of sales for EMEA, says no company by itself will win market share. David Arminas reports from Germany The driver of the charter bus stood outside the hotel in Trier, Germany, and waved at a passing local city bus. “I know the driver,” he told one of the assembled journalists waiting for the group’s ride to the nearby Volvo CE plant. “He is retired but they brought him back because young people th
  • New array of earthmoving machines
    August 7, 2020
    Several firms are introducing new earthmoving machines with increased performance
  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site