Skip to main content

Klever PMB plant from Massenza

Italian firm Massenza has carried out an extensive redesign of its PMB plant line-up. The new generation of PMB plants from the firm includes three models, the compact Smart model, the medium-sized Klever and the top-of-the-range Super Klever.
July 9, 2025 Read time: 2 mins
Klever PMB plant from Massenza

The Smart model is designed for customers that need lower quantities of PMBs and want to make a relatively modest investment. Increased output is produced by the medium Klever unit while the Super Klever offers the biggest output as well as a range of intelligent features. The firm says that its three-model range meets the demands of all road contractors and most resellers and/or oil companies.

An array of improvements and modifications has been carried out, boosting performance over the previous models. A key feature is that the mixers now have a circular section, reducing the risk of bitumen/polymer residues on the mixer walls and increasing polymer dispersion. The mixers have an automatic heating system that provides better temperature control, preventing overheating and saving energy. High shear mills are placed in the central part of the plant, allowing a more compact design and easier maintenance.

In addition, the Klever model can also be upgraded to a Super without any modification to the plant’s skid once the plant is already at site. A bigger motor is fitted for the mill feed pump which boosts performance and means that there is more power for production of materials with high polymer percentages.

The new control room is equipped with thermal and acoustic insulation as well as a heat pump for heating/cooling, which provides more comfort for the plant operator. The plants also have reduced dimensions, allowing them to be shipped in a standard container.

All plants can be equipped with a number of options, such as polymer big-bag emptying systems, various liquid-additives dosing and loading systems and a solid-additive, micro-batch screw feeder.

The first plants of this new generation have already been supplied and commissioned in Saudi Arabia and Romania. Other units are under construction for clients located in the Middle East, Europe and South America.

For more information on companies in this article

Related Content

  • Astec develops innovative asphalt plant with additional recycling capability
    June 23, 2015
    Astec’s headline RAP plant can use up to 65% RAP content As it does for the 50% double barrel system aggregate dryer/drum mixer model, Astec is guaranteeing that its customers will get the increased percentage. The unit runs at 181-360tonnes/hour production (200-400UStons/hour). Astec, based in Chattanooga, Tennessee, manufactures all of their state-of-the-art Hot Mix Asphalt plants in the US. They introduced the first double barrel plant in 1989, according to executive vice president Steven Claude, during
  • Moving the earth with improved environmental credentials
    August 9, 2018
    Driver comfort, more power and improved environmental credentials highlight some of the latest earthmoving equipment Doosan Construction Equipment has launched a new version of the company’s DA30 30tonne class articulated dump truck (ADT), now in a new colour scheme. Most of the changes are for better operator comfort and controllability of the machine. But there are also changes in the driveline and electrical systems. The most important development is an upgrade of the suspension to a hydro-gas self-lev
  • Wirtgen’s new compact milling machines
    May 16, 2022
    Wirtgen says that its new class of compact milling machines are cost-efficient and sustainable
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a