Skip to main content

King is queen of cone laying

A second automated cone-laying vehicle, this time from King Highway, is completing off-road trials with England’s National Highways agency.
December 9, 2021 Read time: 3 mins
The King Highway vehicle with its revolver-style drum for putting out and collecting cones (image courtesy of King Highway)

Working with a group of industry experts, National Highways – formerly Highways England -  has been developing automated cone-laying vehicles to replace the manual method most commonly used now. Two automated vehicles have been developed as part of that vision.

The first, developed by Highway Care, has completed its on-road trials and is now in the marketplace for use by maintenance contractors working on England’s strategic road network – motorways and major A-class trunk highways.

The second vehicle, developed by King, is on extensive off-road testing at Manston Airport in the county of Kent, southern England. This vehicle differs from the Highway Care project – The Falcon - because it relies on a revolver-style design, meaning a huge rotating drum that deploys and collects the cones.

The manual method for deploying cones currently features two people on the rear of a vehicle working in tandem. Usually working at night and in all weathers, the workers lift up to six tonnes in cones alone per shift. The automated vehicles will improve safety and free up two workers for other tasks.

“The King vehicle is very innovative and off-road tests have been extremely promising so far,” said Martin Bolt, head of lean and continuous improvement at National Highways, formerly Highways England. Experts from Highways. Experts from highway maintenance firm Kier, traffic management consultants HW Martin and competitors Highway Care and King Highway are working together in a collaborative effort on the project.

The vehicle system was developed by King Group in conjunction with Verdegro, a UK maker of  attenuators, site lighting and message signs, noted James Richmond, director at King Group. “The design enables it to be used as a multi-purpose vehicle, negating the requirement for an impact protection vehicle while setting out the signs and taper. The vehicle uses standard 1m cones which are laid and collected in a continuous cycle via the rotating barrel.”

The vehicle will move onto road trials later this year, said Richmond. Highways England has helped fund this project through the Innovation Designated Funds programme and established a minimum standard while the companies are developing the vehicles.

An average 1m-high cone weighs around 10kg. A typical 4km closure involves putting down – and later removing – between 260-300 cones, meaning that two workers will both handle between 5-6tonnes of cones per shift. When additional equipment such as frames, signs,lamps and sandbags are factored in, it is not unreasonable for them to lift between 8 and 10tonnes per shift. A single kilometre of coning can take 15 minutes to install and remove, resulting in an exposure time to live traffic of around two hours per shift.

National Highways is the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • Innovative, quality asphalt surfacing solutions
    February 22, 2012
    An array of innovative mix designs and special processes have been introduced to the paving market in recent years. These are now being used in many site applications and are offering contractors the benefits of fast application and high surface quality while providing safe, cost-effective and hard wearing solutions with long life for clients.
  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Skanska wins major A46 upgrade in England
    September 2, 2022
    Construction on the deal worth almost €404.5 million is scheduled to start in 2025.