Skip to main content

Kemroc’s chain technology cuts trenches faster

Attachment specialist Kemroc has brought two new cutting systems to Intermat for the first time: its EK range for cutting trenches - and a new system within its Cut & Break (C&B) range which can be used for demolition of civil structures or for rock extraction. “This is the first time we have exhibited the chain cutter in France,” says Klaus Ertmer, Kemroc managing director and the inventor of all the attachments. “Because the cutting head has a chain in the middle, it means that you can dig very small, d
April 23, 2018 Read time: 3 mins
Attachment specialist 8755 Kemroc has brought two new cutting systems to Intermat for the first time: its EK range for cutting trenches - and a new system within its Cut & Break (C&B) range which can be used for demolition of civil structures or for rock extraction.


“This is the first time we have exhibited the chain cutter in France,” says Klaus Ertmer, Kemroc managing director and the inventor of all the attachments. “Because the cutting head has a chain in the middle, it means that you can dig very small, deep trenches with the machine.”

Emroc developed the machine in response to feedback from customers, says Ertmer. Standard cutter attachments have cutting wheels at either edge, and must be moved from one side to another to dig the trench, whereas with the EK tools, a straight cut is possible.  This requires less skill from the excavator or backhoe operator and also speeds up the process.

Ertmer started developing the EK range in 2012, perfecting the chain technology – which has been patented - in the Middle East. “It took us a long time to make the chain reliable,” says Ertmer. “It wasn’t easy.” To date, Kemroc has sold around 60 EK attachments, says Ertmer, largely in the Middle East but also in Europe too.

Visitors to Ertrmer’s stand, which is adjacent to that of its French dealer, Witek, can also see the combination of a slim DMW cutter wheel with its new C&B breaker tool. This system could be used to demolish reinforced concrete structures or for rock extraction.

The DMW wheel is first used to cut slots in the concrete or rock, with the spacing and depth dependent on the material being cut. The wedge-shaped breaker with picks at either side of its tip is then pushed into the grooves to force the concrete or rock apart.

“It makes a good alternative where drill and blast is not possible, due to restrictions on noise or vibration,” says Ertmer. “It can be used for breaking soft or medium-hardness rock.”

Though Ertner designed his first cutting tool attachment in 2000, Kemroc has only been in existence for just over a year - since Atlas Copco acquired Ertmer’s firm Erkat which supplies traditional trenching tools, without the central chain technology. Kemroc supplies markets around the world, says Ertner, including its home country of Germany, Switzerland, North Africa, Japan and the US.

For more information on companies in this article

Related Content

  • Moving the earth with improved environmental credentials
    August 9, 2018
    Driver comfort, more power and improved environmental credentials highlight some of the latest earthmoving equipment Doosan Construction Equipment has launched a new version of the company’s DA30 30tonne class articulated dump truck (ADT), now in a new colour scheme. Most of the changes are for better operator comfort and controllability of the machine. But there are also changes in the driveline and electrical systems. The most important development is an upgrade of the suspension to a hydro-gas self-lev
  • New tunnelling technology offering greater efficiency
    January 4, 2017
    Tunnelling technology is seeing major developments that will boost construction efficiency - Mike Woof writes Both in tunnel drilling and TBM systems, new machines are now being built that offer major gains in performance. Sandvik is introducing a number of major new models developments to its tunnelling drill range. Three new tunnelling jumbos are now available that suit different drilling requirements, the DD422iE, DT912D and DT922i. The firm says that its advanced DD422iE rig offers major advantage
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Sandvik construction machines helping build Hong Kong tunnel link
    October 11, 2017
    Machines from Sandvik are playing important roles in the construction of a new tunnel connection to Hong Kong. The Liantang/Heung Yuen Wai Boundary Control Point (BCP for short) is a series of infrastructure projects that will see the construction of the latest land crossing between Shenzhen in China and Hong Kong. This project includes the construction of highways and tunnels. The crushing and drilling equipment from Sandvik Mining and Rock Technology being used for the work is being supported by Sandvik’