Skip to main content

Just stop arguing and build the thing

The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
December 15, 2017 Read time: 3 mins
The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate.


The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy.

Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeological site to remain undisturbed. However some claim that the tunnel, is simply not long enough.

With this in mind it is worth remembering that the Stonehenge Bypass project has been planned since the late 1980s. The project went to public consultation in 1993 and the route was identified in 1995, with it then being withdrawn in 1996. In 1998, the project was put forward again and a preferred route announced in 1999, but after a public inquiry in 2004 and concerns over costs in 2005, it was withdrawn once more in 2007. It seems the work may finally go ahead, but only if it passes a few more hurdles. The dispute over whether a 2.6km tunnel is long enough is just one issue. Other complaints describe the planned tunnel portals as unsightly and say that the existing (and heavily congested) road link should remain.

But nor are such failures to develop much-needed infrastructure links limited to the UK. In the Canadian province of British Colombia came the news recently that plans for a US$2.8 billion, 10-lane bridge crossing to replace the aged George Massey Tunnel near Vancouver had been halted. The 3km-long cable-stayed bridge would have been built to the latest standards and would boost both safety and capacity, cutting congestion for drivers. It is much needed. The tunnel, constructed in the 1950s and opened to traffic in 1959, is no longer fit for purpose. The four-lane tunnel is the subject of serious congestion and does not meet the latest safety standards. More worryingly still, there are concerns as to whether it would withstand an earthquake, as Vancouver lies close to the Cascadia Fault. Perhaps the new Massey Bridge will get the go-ahead, once the local politicians realise that not to build it will cause more fuss in the long run. Only time will tell.

Related Content

  • One Giant Leap for mankind…
    October 8, 2019
    This past month of July America and much of the world celebrated the 50th anniversary of man setting foot on the moon. There were speeches, replays of the Saturn V launch and lunar landing videos, interviews with astronauts, and much more as we relived the excitement, danger, and suspense of sending human beings 384,000km into space to land on an uninhabited moon and return. Most Americans over the age of five in 1969 can tell you where they were when the Eagle landed on July 20, 1969, and the world watch
  • New Columbia River bridge proposed
    December 2, 2020
    A new bridge spanning the Columbia River has been proposed.
  • €900 million German Autobahn project
    July 21, 2025
    Planning is underway for a €900 million German Autobahn project.
  • Portugal's road safety initiative
    February 14, 2012
    The Portuguese experience with road safety has proved that planning, development, introduction, and hard work do pay off in the end. Paulo Marques Augusto, president of the National Road Safety Authority (ANSR), explained that in the last 10 years a decrease of over 50% has been achieved in the number of fatalities on the road network despite a continuing growth in traffic demand (there are five million vehicles in Portugal), and a similar reduction in travel time on most of the connections between Lisbon a