Skip to main content

Just stop arguing and build the thing

The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
December 15, 2017 Read time: 3 mins
The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate.


The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy.

Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeological site to remain undisturbed. However some claim that the tunnel, is simply not long enough.

With this in mind it is worth remembering that the Stonehenge Bypass project has been planned since the late 1980s. The project went to public consultation in 1993 and the route was identified in 1995, with it then being withdrawn in 1996. In 1998, the project was put forward again and a preferred route announced in 1999, but after a public inquiry in 2004 and concerns over costs in 2005, it was withdrawn once more in 2007. It seems the work may finally go ahead, but only if it passes a few more hurdles. The dispute over whether a 2.6km tunnel is long enough is just one issue. Other complaints describe the planned tunnel portals as unsightly and say that the existing (and heavily congested) road link should remain.

But nor are such failures to develop much-needed infrastructure links limited to the UK. In the Canadian province of British Colombia came the news recently that plans for a US$2.8 billion, 10-lane bridge crossing to replace the aged George Massey Tunnel near Vancouver had been halted. The 3km-long cable-stayed bridge would have been built to the latest standards and would boost both safety and capacity, cutting congestion for drivers. It is much needed. The tunnel, constructed in the 1950s and opened to traffic in 1959, is no longer fit for purpose. The four-lane tunnel is the subject of serious congestion and does not meet the latest safety standards. More worryingly still, there are concerns as to whether it would withstand an earthquake, as Vancouver lies close to the Cascadia Fault. Perhaps the new Massey Bridge will get the go-ahead, once the local politicians realise that not to build it will cause more fuss in the long run. Only time will tell.

Related Content

  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Cost-effective cold mix asphalt recycling
    February 17, 2012
    In Lithuania, cold mix asphalt containing recycled asphalt pavement has been installed in a new base course overlay for a section of the A1, the country's most heavily trafficked motorway.
  • Urban gridlock for UK capital?
    March 8, 2017
    The UK’s capital London suffers from some of the worst traffic congestion in Europe, with only Moscow registering far worse conditions on a regular basis. Traffic speeds along key routes in the centre of the city have long had a reputation for being low but recent research shows that they have fallen yet again. According to Transport for London (TfL), average traffic speeds in the centre of the city are just 12.5km/h, roughly the same as they were in the 19th century when the majority of road traffic was ho