Skip to main content

Just stop arguing and build the thing

The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
December 15, 2017 Read time: 3 mins
The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate.


The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy.

Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeological site to remain undisturbed. However some claim that the tunnel, is simply not long enough.

With this in mind it is worth remembering that the Stonehenge Bypass project has been planned since the late 1980s. The project went to public consultation in 1993 and the route was identified in 1995, with it then being withdrawn in 1996. In 1998, the project was put forward again and a preferred route announced in 1999, but after a public inquiry in 2004 and concerns over costs in 2005, it was withdrawn once more in 2007. It seems the work may finally go ahead, but only if it passes a few more hurdles. The dispute over whether a 2.6km tunnel is long enough is just one issue. Other complaints describe the planned tunnel portals as unsightly and say that the existing (and heavily congested) road link should remain.

But nor are such failures to develop much-needed infrastructure links limited to the UK. In the Canadian province of British Colombia came the news recently that plans for a US$2.8 billion, 10-lane bridge crossing to replace the aged George Massey Tunnel near Vancouver had been halted. The 3km-long cable-stayed bridge would have been built to the latest standards and would boost both safety and capacity, cutting congestion for drivers. It is much needed. The tunnel, constructed in the 1950s and opened to traffic in 1959, is no longer fit for purpose. The four-lane tunnel is the subject of serious congestion and does not meet the latest safety standards. More worryingly still, there are concerns as to whether it would withstand an earthquake, as Vancouver lies close to the Cascadia Fault. Perhaps the new Massey Bridge will get the go-ahead, once the local politicians realise that not to build it will cause more fuss in the long run. Only time will tell.

Related Content

  • Budgeting for Vietnam’s North-South Expressway project
    October 25, 2022
    Vietnam is budgeting for its North-South Expressway project.
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Crossing the Alps for five decades
    March 24, 2020
    Italy’s A22 Autostrada route is a key transport connection for Europe and also a model for efficient operational management