Skip to main content

JLG adds to mast boom range with lightweight models

JLG has added two new lightweight versions to its range of Toucan mast boom lifts, the Toucan 8E-L and the Toucan 10E-L which will be available from June this year. “The 8E-L is now in a weight category that allows it to be carried into service elevators, making it much more versatile,” said Jan-Willem van Wier, product marketing manager for aerial platforms. “The 10 E-L can be towed behind a vehicle in a 3.5 tonne trailer.”
April 20, 2016 Read time: 2 mins
The Toucan 10E-L is one of two new lightweight models from JLG

2199 JLG has added two new lightweight versions to its range of Toucan mast boom lifts, the Toucan 8E-L and the Toucan 10E-L which will be available from June this year.

“The 8E-L is now in a weight category that allows it to be carried into service elevators, making it much more versatile,” said Jan-Willem van Wier, product marketing manager for aerial platforms. “The 10 E-L can be towed behind a vehicle in a 3.5 tonne trailer.”

JLG has achieved the weight reduction by reducing the counterweight so that the lifts now have a one-person capacity rather than a two-person one.

There are other improvements too. The machines have a better slope rating: 2.5 degrees rather than 2 degrees  which improves the outdoor versatility of the lifts, said van Wier.

Both the lightweight Toucan 8E and 10E and their standard cousins have been improved to reduce the amount of maintenance they need. AGM batteries have replaced wet cell ones. “They are virtually maintenance-free,” said van Wier. The mast is also grease-free, achieved by using nylon blocks.

“With these four machines, our customers are able to choose the one that best meets their needs,” said van Wier.

All videos

For more information on companies in this article

Related Content

  • New small bridge inspection from Moog
    January 6, 2017
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.
  • New small bridge inspection from Moog
    April 17, 2013
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.
  • Multiple roles for compact construction machines
    February 24, 2012
    Versatility remains the key for the utility equipment sector. The range of duties that compact machines can be used for continues to grow.
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac