Skip to main content

Jet intersection

In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.
February 18, 2013 Read time: 1 min
In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.

Related Content

  • Patching potholes on a highway and runway
    February 13, 2017
    Ultracrete products have been used to tackle two difficult pothole patching problems, at Santiago’s busy airport in Chile and on a coastal highway on the island of Reunion.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • Pavers providing smooth runway for Saudi Arabia
    October 2, 2014
    Jeddah’s international airport in Saudi Arabia is benefiting from a major revamp to help boost capacity. The King Abdulaziz International Airport (KAIA) near Jeddah has seen a massive increase in passenger numbers in the last 20 years Demand has continued to grow due to both business travel and religious tourism and the KAIA authorities opted to expand the facilities in 2006, in line with anticipated needs. That first phase of the planned expansion is being completed during this year, making KAIA the la
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off