Skip to main content

Jet intersection

In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.
February 18, 2013 Read time: 1 min
In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.

Related Content

  • UAE’s crash and collision causes revealed
    April 5, 2016
    A major cause of car crashes in the UAE can be revealed to be poor use of indicators. This has been revealed in a survey of drivers in the UAE by YouGuv, carried out on behalf of Qatar Insurance Company and RoadSafetyUAE. The survey of over 1,000 UAE drivers showed that only 15% of motorists are seen using indicators when driving. However 67% of those responding to the survey said that they use their indicators most of the time. Meanwhile 90% of drivers responding to the survey said they believe that using
  • Versatile concrete paving machines
    July 13, 2012
    Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the Sinohydro-Gamuda-WCT joint venture was awarded the contract to build two runways, thr
  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Work underway for Brazil’s Santos-Guarujá Tunnel
    January 12, 2024
    Work is underway for Brazil’s Santos-Guarujá Port Tunnel project.