Skip to main content

Jet intersection

In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.
February 18, 2013 Read time: 1 min
In Sao Paolo, drivers had a lucky escape when a light aircraft overshot a runway and crashed at the edge of a busy highway. Unable to stop in time, the small jet was only prevented from ploughing into traffic on the highway by the airport’s perimeter fence.

Related Content

  • Mallorca Airport upgrade completed
    September 21, 2021
    Palma de Mallorca Airport (PMI) reopened its northern runway (06L-24R) at the end of 2020, after completing the surface refurbishment work
  • Twice as lucky?
    February 19, 2014
    A driver in Australia was stopped by police the day after he had consumed a large quantity of beer and found to be still two times over the limit for alcohol. Officers commented that the Melbourne resident was in fact lucky to be alive given the quantity of alcohol he had consumed.
  • SmartDrive testing safer signalised intersections for emergency responders
    May 15, 2012
    While both the police and firefighting are recognised as occupations that carry dangers, nearly 13 per cent of the firefighters and police officers who die in the line of duty are killed in vehicle-related incidents, while fire trucks are involved in ten times as many collisions as other heavy trucks.
  • U.S National Guard’s airport upgrade
    October 12, 2012
    In Kansas, specialist contractor Pavers has carried out important work for the National Guard. The aim of the work was to rehabilitate a WWII era hangar apron for the Kansas National Guard. The project required extensive repair work, including pavement patching, dowel bar retrofitting, partial depth patching and joint sealing. Pavers had to overhaul a 305m x 91.5m apron at Army Aviation Support Facility No 2 that suffered from poor drainage. The project included milling 152mm of old asphalt and concrete and