Skip to main content

JCB excavator delivering on Italian roadbuilding job

The JCB JS220NLC tracked excavator (pictured) is being to work on the complex construction of a 1.2km link road in Rovereto, North East Italy. Purchased by major Italian Construction group, Consta SpA and supplied by Ala-based JCB dealer OMP, the machine is working alongside a JCB JZ140 model on the project. Earthmoving project manager, Massimo Broz said: “We have many JCB models in our fleet. It is a brand that we have used for many years and we are very satisfied. Performance, efficiency and fuel consumpt
January 3, 2013 Read time: 2 mins

The JCB JS220NLC tracked excavator (pictured) is being to work on the complex construction of a 1.2km link road in Rovereto, North East Italy.

Purchased by major Italian Construction group, Consta SpA and supplied by Ala-based JCB dealer OMP, the machine is working alongside a JCB JZ140 model on the project.

Earthmoving project manager, Massimo Broz said: “We have many JCB models in our fleet. It is a brand that we have used for many years and we are very satisfied. Performance, efficiency and fuel consumption are excellent as is the reliability of the machines which require little maintenance.”

Carried out on behalf of the Province of Trento’s Department of Civil Protection and infrastructure, the €4 million project includes the construction of a railway underpass, a 41m diameter roundabout, drainage, the insertion of water pipes and the road itself.

Related Content

  • Jewson claims world’s largest JCB Vibromax fleet
    January 4, 2013
    Jewson Tool Hire has purchased 40 new JCB VMT160-80 tandem vibratory rollers - joining 80 existing models to create what is claimed to be the largest fleet of JCB Vibromax compaction equipment worldwide. A core service from one of the UK’s leading builder’s merchants, Jewson Tool Hire’s (JTH) newly topped-up 120 roller rental fleet takes the total number of JCB machines owned by JTH to over 500. This includes several significant orders for JCB mini and micro excavators. All of the machines are available to
  • Dubai infrastructure development
    March 24, 2017
    New infrastructure is being built in Dubai with the help of machines from Volvo CE The Dubai Water Canal is being built in a busy and congested urban area, with the project including construction of major new road bridge crossings. The work is being carried out by Turkish infrastructure specialist DETECH Contracting. The 3.2km waterway is being built through downtown Dubai and is among the most ambitious projects being carried out in the country. When fully opened in 2017 the project – called The Duba
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.