Skip to main content

Isle of Wight road stability scheme ‘first’ at Niton’s Undercliff

John Peck Construction has been awarded the contract to carry out the first major road stability scheme at Niton’s Undercliff on the Isle of Wight, England’s largest island. This project is part of a major programme of special geotechnical schemes being delivered by Island Roads (made up of VINCI Concessions, Meridiam Infrastructure and Ringway) under the Highways PFI to maintain the highway at locations prone to ground movement.
February 19, 2014 Read time: 2 mins
John Peck Construction has been awarded the contract to carry out the first major road stability scheme at Niton’s Undercliff on the Isle of Wight, England’s largest island.

This project is part of a major programme of special geotechnical schemes being delivered by Island Roads (made up of 4084 Vinci Concessions, 7167 Meridiam Infrastructure and 2393 Ringway) under the Highways PFI to maintain the highway at locations prone to ground movement.

Worth in the region of €1.19 million (£1 million), the contract is one of the largest ground stability/highway projects secured by Rookley-based John Peck Construction, on the Isle of Wight.

The work at the Undercliff, where the underlying clay foundations have caused frequent and historic issues of movement, will be undertaken at three sections. In the vicinity of Undercliff Caravan Park and Woodlands, the highway will be anchored by 25m steel cables driven through the clay layers into a more substantial layer of rock. At a section above Hunts Road, more than 112 ten metre concrete piles will be inserted into the ground to strengthen the highway.  This operation involves the use of specialist equipment which seeks to adopt a quieter method of installation of the piles and limit the need for lengthy road closures.

The Undercliff scheme was originally scheduled for 2015 and was brought forward after on-going monitoring revealed greater than expected recent movement.

The initial part of the Undercliff work will involve site preparation. John Peck Construction started their stabilisation works from 18 November 2013 and these will be on-going through to 30 April 2014 to ensure they are completed outside of the main tourist season.

For more information on companies in this article

Related Content

  • Highways England awards €2.1 billion of upgrades for UK motorways
    August 7, 2015
    Highways England has today appointed six joint-venture companies to design and build 10 “smart motorways” as part of a €2.1 billion investment. Construction contractors appointed are the Balfour Beatty and VINCI joint venture, a Costain and Galliford Try joint venture, as well as a Carillion and Kier joint venture. Designers are a CHM2 and Hyder joint venture, an Amey and Arup joint venture, as well as a Jacobs and Atkins joint venture. The award is the second major procurement to be given under th
  • Godshilla makes a run for it and blocks Isle of Wight road
    February 23, 2016
    It was a heart-stopping moment late one night as a car approached an 8m tall animal that was blocking the road. Most people, seeing what should have been an extinct dinosaur – a triceratops – in their path would have turned and run in the opposite direction. But for people in the English village of Godsill, on the Isle of Wight, the dinosaur was a well-known resident, albeit not a living animal. Chris Hollingshead snapped the photo and put it on his Facebook, which can be seen by clicking here.
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year