Skip to main content

Intelligent monitoring of concrete pours cuts time on site

Intelligent monitoring of concrete strengths is helping contractors shave weeks off construction programmes, according to formwork specialist Doka. Its Concremote system measures the temperature of the concrete, converts that to predicted strength and allows the contractor to strike the formwork when the concrete is ready – rather than waiting for a set number of days. “Concretemote is being used on 20 to 25 projects,” said Doka’s director of research and development Johann Peneder.
April 12, 2016 Read time: 2 mins
The Concremote concrete monitor can allow contractors to strike forms earlier

Intelligent monitoring of concrete strengths is helping contractors shave weeks off construction programmes, according to formwork specialist 203 Doka. Its Concremote system measures the temperature of the concrete, converts that to predicted strength and allows the contractor to strike the formwork when the concrete is ready – rather than waiting for a set number of days.

“Concretemote is being used on 20 to 25 projects,” said Doka’s director of research and development Johann Peneder. “In some countries we cannot fully use the advantages of Concremote due to the regulations, which are based on previous experience, but this is the first steps towards employing techniques which will give a more efficient and economical way to build.”

The latest development of the Concremote system will see formwork panels with ready-made positions for the Concremote sensor to plug into - currently it sits on top of the concrete pour. Called Concremote plug.IN, this addition will allow faster and more flexible monitoring of concrete strengths, Peneder added.

“Contractors can use products such as Concemote for long-term quality monitoring of the job sit,” he continued. “They can then add that data into the BIM model and can transfer that data to the owner.”

One of Concremote’s current applications demonstrates its benefits in countries with huge climatic variation. On Canada’s Muskrat Falls hydro power project, where temperatures can fall to minus 40degrees C, it has allowed earlier striking of forms but also ongoing monitoring of the concrete after striking. This allows the contractor to protect the concrete where necessary to avoid temperature shock - between the hot concrete and cold outside - and hence prevent damage.

All videos

For more information on companies in this article

Related Content

  • WiM eases bridge structural health worries
    March 22, 2024
    Concerns about ageing road bridges are leading road authorities to consider the case for using weigh-in-motion - WiM - solutions to monitor health of such infrastructure, writes Adam Hill.
  • New tests for modified bitumens and mixes with RAP
    December 19, 2014
    This month we learn about a new test which is helping to predict the performance of asphalt mixtures containing recycled materials and modifiers, and we showcase some of the new testing equipment recently launched - writes Kristina Smith Researchers in the US have come up with a new test to help owners and contractors better predict the performance of their roads. “The problem is that the current tests cannot determine the performance of new materials,” said Dr Haleh Azari, manager of the AASHTO Advanced P
  • Bauer’s BG 30, part of the rig manufacturer’s ValueLine platform
    March 7, 2016
    Bauer Maschinen is presenting a new generation of its ValueLine, a medium-sized platform range for bored piles with a diameter of up to 2.5m and a drilling depth of up to 70m. The platform range includes the BG 26 as the lowest priced-model and the larger version, the BG 30. The core element of the medium-sized platform range is the joint BT base carrier, which was entirely designed and constructed by Bauer. The modern and highly functional support does not just score points for its high safety standa
  • Bauer’s BG 30, part of the rig manufacturer’s ValueLine platform
    January 6, 2017
    Bauer Maschinen is presenting a new generation of its ValueLine, a medium-sized platform range for bored piles with a diameter of up to 2.5m and a drilling depth of up to 70m. The platform range includes the BG 26 as the lowest priced-model and the larger version, the BG 30. The core element of the medium-sized platform range is the joint BT base carrier, which was entirely designed and constructed by Bauer. The modern and highly functional support does not just score points for its high safety standa