Skip to main content

InspectTech is right on time

All 15 US states using Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports. Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximis
February 6, 2017 Read time: 2 mins
Mobile data collection is part of the AssetWise InspectTech abilty
All 15 US states using 6197 Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports.

Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximise return on investment in transportation infrastructure. AssetWise InspectTech delivers inspection data as required by MAP-21 and the bridge element (NBI) schemes which then must be sent by a set date to the FHWA which then compiles a national inventory.

The state of Nevada again submitted data on time, said Michael Premo, the department of transportation’s bridge inspection team. “The ability of AssetWise InspectTech to support our Nevada-specific inspection needs and meet the MAP-21 and NBI deadlines is a testament to its flexibility,” he said. “It allows our inspectors to accurately and efficiently collect, manage and submit all required data including mobile data from the field in the required format.”

AssetWise InspectTech provides performance metric reports and dashboards based on industry best practices for NBI and NBE submission, performs error checks and automated sufficiency rating calculations that prevent errors during the data collection process, and, through timely reporting. Bentley said that its extensive configuration tools allow state agencies to tailor the application to meet their respective needs while still supporting all required federal reports.

For more information on companies in this article

Related Content

  • Key developments are changing the face of the machine control market
    April 4, 2013
    Various business moves are changing the face of the machine control sector - Mike Woof reports An array of developments, both business moves and new technologies, are changing the focus for the machine control segment of the construction equipment sector. For a long time three firms, Leica Geosystems, Trimble and Topcon, have dominated this segment. The three are retaining their strong positions in the market but are seeing additional competition from Hemisphere and MOBA. Arguably the biggest news is that T
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • US driving distances see continued increase
    September 6, 2017
    New data released by the US Department of Transportation’s (USDOT) Federal Highway Administration (FHWA) shows that US driving topped 2.53 trillion kilometres in the first six months of 2017. This continues a streak of steadily increasing vehicle distances travelled that began in 2011.
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.