Skip to main content

InspectTech is right on time

All 15 US states using Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports. Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximis
February 6, 2017 Read time: 2 mins
Mobile data collection is part of the AssetWise InspectTech abilty
All 15 US states using 6197 Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports.

Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximise return on investment in transportation infrastructure. AssetWise InspectTech delivers inspection data as required by MAP-21 and the bridge element (NBI) schemes which then must be sent by a set date to the FHWA which then compiles a national inventory.

The state of Nevada again submitted data on time, said Michael Premo, the department of transportation’s bridge inspection team. “The ability of AssetWise InspectTech to support our Nevada-specific inspection needs and meet the MAP-21 and NBI deadlines is a testament to its flexibility,” he said. “It allows our inspectors to accurately and efficiently collect, manage and submit all required data including mobile data from the field in the required format.”

AssetWise InspectTech provides performance metric reports and dashboards based on industry best practices for NBI and NBE submission, performs error checks and automated sufficiency rating calculations that prevent errors during the data collection process, and, through timely reporting. Bentley said that its extensive configuration tools allow state agencies to tailor the application to meet their respective needs while still supporting all required federal reports.

For more information on companies in this article

Related Content

  • Michelin Earthmover’s enhanced OperTrak record
    April 11, 2013
    Michelin Earthmover has unveiled MICHELIN OperTrak, said to be a comprehensive, easy to use web-based tyre and rim management system designed to monitor tyre activity and optimise budgeting, forecasting, inventory and performance. The system is available to end users and key accounts through Michelin representatives and its dealers. “MICHELIN OperTrak is the solution that many fleets have been waiting for,” said Michael Reich, manager for MICHELIN OperTrak. “Users will have the opportunity to experience th
  • Smarter compaction technology in use in Missouri
    October 2, 2018
    Intelligent compaction and infrared scanning technologies have been used to improve construction quality The Missouri Department of Transportation (MoDOT) carried out a year-long project throughout 2017 to demonstrate the use of intelligent compaction (IC), infrared scanning (IR), and Veta software to improve pavement construction operations. “We were looking for ways to assess quality in asphalt projects,” said Bill Stone, research administrator at MoDOT. “We are working towards better pavements that l
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Call out for Bentley digital award nominations
    April 2, 2021
    Bentley Systems is calling out for nominations for its digital awards.