Skip to main content

InspectTech is right on time

All 15 US states using Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports. Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximis
February 6, 2017 Read time: 2 mins
Mobile data collection is part of the AssetWise InspectTech abilty
All 15 US states using 6197 Bentley’s AssetWise InspectTech software achieved reporting compliance with annual Federal Highway Administration’s MAP-21 National Bridge Inventory and National Bridge Element schemes. Taylor Gilmore, product manager for AssetWise InspectTech, said the software was used to inspect over 175,000 bridges for their clients’ 2016 Federal Highway NBI and NBE data reports.

Faced with ageing bridge infrastructure nationwide, FHWA’s MAP-21 performance-based programme is designed to maximise return on investment in transportation infrastructure. AssetWise InspectTech delivers inspection data as required by MAP-21 and the bridge element (NBI) schemes which then must be sent by a set date to the FHWA which then compiles a national inventory.

The state of Nevada again submitted data on time, said Michael Premo, the department of transportation’s bridge inspection team. “The ability of AssetWise InspectTech to support our Nevada-specific inspection needs and meet the MAP-21 and NBI deadlines is a testament to its flexibility,” he said. “It allows our inspectors to accurately and efficiently collect, manage and submit all required data including mobile data from the field in the required format.”

AssetWise InspectTech provides performance metric reports and dashboards based on industry best practices for NBI and NBE submission, performs error checks and automated sufficiency rating calculations that prevent errors during the data collection process, and, through timely reporting. Bentley said that its extensive configuration tools allow state agencies to tailor the application to meet their respective needs while still supporting all required federal reports.

For more information on companies in this article

Related Content

  • Data handling for efficient machine control
    October 16, 2012
    The rapid increase in information availability is transforming the construction sector. Conventional methods used for sourcing geographic data based on maps and localised sampling meant that there was often a lack of accurate information relating to ground conditions at specific areas where work was planned, often resulting in unwelcome surprises for construction companies along with additional costs for projects.
  • Us bridges pose cause for concern
    August 2, 2017
    On Aug 1st 2017, it was 10 years since the I-35W Bridge in Minneapolis collapsed. The bridge had been classified as structurally deficient and was undergoing repair at the time. However the repairs focussed on the decking rather than the structure, with the additional weight of the extra asphalt layers and the construction machinery parked adding to the total load and contributing to the collapse.
  • Malaysia’s massive road building project is advancing the use of technology
    August 10, 2020
    Malaysia’s huge Pan Borneo Highway project is benefiting from the use of some of the latest technologies in its planning, design and construction
  • Streamlined, efficient road marking
    March 2, 2012
    Roadmarking contractor DBi Prismo has rolled out an iPhone application strategy to ensure seamless communication between its on-site workforce and office based departments.