Skip to main content

Innovative formwork from Weckenmann

Weckenmann Anlagentechnik says the response from selected customers was exceptionally positive, when it presented its “innovative concept” of transportable formwork, the Mobile Battery Mould (MBM). It is a system for the production of precast concrete elements in the immediate vicinity of the construction site, and Weckenmann Anlagentechnik says that two large construction companies in Singapore opted for the MBM concept independently of one another. Both production plants have started operations successful
January 6, 2017 Read time: 2 mins
Weckenmann Anlagentechnik says the response from selected customers was exceptionally positive, when it presented its “innovative concept” of transportable formwork, the Mobile Battery Mould (MBM).

It is a system for the production of precast concrete elements in the immediate vicinity of the construction site, and Weckenmann Anlagentechnik says that two large construction companies in Singapore opted for the MBM concept independently of one another.

Both production plants have started operations successfully.

A special feature of the MBM is the controllable trailer, which improves the trailer's manoeuvrability. This is especially important after the conclusion of the work, when the mould sometimes has to find its way out of very confined conditions on the site.

“The MBM offers the construction site all the advantages of the precast technology and avoids the disadvantages, which are caused in particular by additional transport. At the same time it meets the requirements of the construction site where restricted space conditions prevail; the number of qualified staff is limited and the environmental conditions always represent certain challenges,” says Weckenmann.

“The mobile field factory from Weckenmann can be an ideal solution for large building sites: its investment costs are manageable, it produces just-in-time and it is enormously flexible.”

Related Content

  • Czech bridge sees world formwork debut
    July 23, 2012
    The Czech government is investing heavily in upgrading and modernising the country's top-tier transportation infrastructure. This year alone, building works with a total investment of over E1.6 billion are planned or underway on the Czech motorway and main road network. Completion of the D8 motorway between the Czech capital Prague and Dresden in the east of Germany has a high priority, and as part of this large-scale project, the contracting consortium of SMP and Metrostav is erecting the 585m long Prosmyk
  • VDMA questions emissions future
    February 28, 2012
    The German construction equipment manufacturer's association, the VDMA, has stated that the new EU-exhaust emission directive presents a major challenge for its members.
  • Asphalt products manufactured to customer requirements
    February 10, 2012
    Spanish company DITECPESA has developed, manufactured and sold asphalt products since 1988, and has grown steadily due to the supply and quality of its services, the extension of its product range, and the use of applied research projects.
  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,