Skip to main content

Innovative asphalt plant from Benninghoven

Benninghoven claims that its innovative asphalt transfer system boosts the capabilities of the firm’s ECO mixing plant range. The newly developed alternating chute unit is fitted to the firm’s ECO asphalt plant and is said to be a key development for the sector, with a patent pending. The ECO asphalt plant is offered with output ranging from 100-320tonnes/hour and is said to combine the latest Benninghoven technology and quality. Designed for mobility, the plants fit inside standard shipping containers
February 28, 2018 Read time: 3 mins
Benninghoven Asphalt Plant

167 Benninghoven claims that its innovative asphalt transfer system boosts the capabilities of the firm’s ECO mixing plant range. The newly developed alternating chute unit is fitted to the firm’s ECO asphalt plant and is said to be a key development for the sector, with a patent pending.

The ECO asphalt plant is offered with output ranging from 100-320tonnes/hour and is said to combine the latest Benninghoven technology and quality. Designed for mobility, the plants fit inside standard shipping containers sizes, maximising mobility and versatility. The firm says that the ECO units can be operated as stationary plants, but can also handle fast location changes without problems.

Because all main components are designed in standard container dimensions, they can be easily transported by road, sea or rail. The plants are also said to be cost-efficient and effective, while offering optimum mix quality.

The firm says that the ECO plants feature maintenance-friendly, high-quality and durable components. Improved maintenance is achieved by large service openings, LED lighting, a simplified lubrication, good accessibility and the availability of an electric and compressed air connection for tools as well as an 800mm wide platform width.

Weighing and mixing is said to be efficient and a key development is its new alternating chute container. The firm relies on loading skip technology as a link between mixer and loading silo, with the skip volume corresponding to the volume of the mixer. The mixer drains the asphalt vertically downwards into the skip, which then positions itself vertically above the targeted loading silo pocket and drains the stored mixed goods vertically downwards. This is a proven technology for excluding segregations in the mixed goods.

But for the new ECO asphalt mixing plant range, Benninghoven has developed a new cost-efficient alternative to the skip track. The alternating chute unit features a purely mechanical structure which is not subject to malfunctions. The design means that no sensor system, motors or brakes are required, while reliability is ensured. The system is said to offer fast and load-free positioning for silo selection. Separation effects in the end product are minimised through cross mixing in the material transfer, while the proven geometry of the Benninghoven loading mixed materials storage silos ensures mass flow instead of core flow, further preventing segregation in the mix.

The firm claims efficient mixing due to the design of the mixer with its optimum fill level and large dimensions. The larger plants in the ECO range include  cold and hot recycling feed, bag feed, foam bitumen, granulate feed, fibrous material feed and adhesive feed. Other important features include a key transfer system for increased safety, a large service opening on the mixer cabinet, purge air cleaning on the infra-red temperature sensor and oil lubrication and filtering for the compressor. The system also offers the choice of plug-in cables and permanent cable connections, while the plant features the latest version of the firm’s sophisticated BLS 3000 control package.

For more information on companies in this article

Related Content

  • Benningoven builds special plant for Norwegian firm
    August 18, 2015
    Benninghoven has built an asphalt plant specially to order for a customer in Norway. Contractor Veidekke had a tight timeframe in which the plant could be erected at the firm’s chosen site in Sörli, as well as specific requirements as to its configuration. Benninghoven was able to construct the special TBA 4000 UC asphalt mixing plant to the firm’s request. A notable feature of the plant is that its large capacity materials towers stand 33m high. The order was received in January 2014, with the plant the
  • More efficient asphalt output from new plants
    November 20, 2015
    Advances in asphalt plant design offer major gains in product throughput and quality, while also allowing for warm asphalt and increased recycling The asphalt sector is constantly looking for ways to optimise production, lower costs and improve product quality and consistency. Competition is fierce in the asphalt plant market, with several of the key companies working hard to develop new and more efficient technologies, as well as equipment that is more versatile and more mobile. Advances have been made
  • Higher productivity, lower cost asphalt plants
    February 14, 2012
    Manufacturers are producing innovative asphalt equipment, and operators are benefiting from this as Patrick Smithreports. Asphalt plant manufacturers and operators are understandably placing great emphasis on higher productivity but with lower costs. At the same time they are aware of environmental issues and the ever-increasing use of recycled material in mixes.
  • Asphalt plants looking at greener production systems
    April 11, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports Lintec, in partnership with Loesche, recently created what they say is the world's first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal. The mobile co