Skip to main content

Innovating sustainability: The amo/Debus Gruppe and the high-tech asphalt plant in Hof, Germany

Founded in 1946 and headquartered in Untersiemau near Coburg, Germany, the amo/Debus Gruppe has grown into a leading force in the building materials and construction logistics industry. With more than 20 locations strategically spread across Northern Bavaria, Thuringia, and Saxony, the company has firmly established itself as a reliable partner in infrastructure development and sustainable construction.
July 29, 2025 Read time: 5 mins
Photo: Ammann Group

At the core of the amo/Debus Gruppe’s success is its longstanding expertise in asphalt production—a journey that began in 1964 with the launch of its first asphalt plant. Over the decades, the company has continued to invest in innovation and efficiency and nowhere is this commitment more evident than at its state-of-the-art facility in Hof.

Cutting-Edge Technology at the Hof Plant

The Hof asphalt plant is a modern marvel in materials engineering. It houses the Ammann HRT 320, a high-performance plant that stands at the forefront of recycling and mixing technology. Designed for both hot and cold recycling, the plant is equipped with a twin-line recycling system capable of efficiently integrating reclaimed materials into the production process. To support this, the system includes four cold feeders dedicated to recycling material and ten cold feeders for new material, allowing for precise dosing and flexibility when incorporating recycled und fresh components into the asphalt mixes.

A standout feature of the Hof facility is its use of the RAH100 system—an advanced warm recycling technology. Powered by a patented hot gas generator system that reuses chimney air, this system allows the plant to produce high-quality asphalt while significantly reducing its environmental footprint. Importantly, the RAH100 system is capable of handling small production runs, making it possible to fulfill small-scale, customized orders using high percentages of recycled material without compromising quality or efficiency.

Photo: Ammann GroupFlexibility is further emphasized through the mixing tower’s six-selection screen, which enables precise sorting of mineral aggregates for tailored mixes. The tower includes a 200-ton hot mineral silo, divided into two rows with a total of 12 chambers, allowing for the storage of multiple aggregate fractions. Two bypass chambers also ensure uninterrupted material flow and rapid changeover between production cycles.

To support binder operations, the plant features four electric heated bitumen tanks, ensuring both storage flexibility and thermal consistency across multiple binder types. The vapors that arise during loading of the tanks or collected in a water lock to avoid odour nuisance on the site.

Additionally, a filler tower silo is installed, including a large chamber for coarse dust and three imported filler silos—one of which is dedicated to hydrated lime. This setup supports precise filler management and allows for the formulation of highly specialized asphalt mixes, enhancing the plant’s overall production range and quality control.

Integrated Storage and Fuel Flexibility

A significant infrastructural part of the plant is the 600-ton ready-mix silo, which is fully integrated into the central mixing tower. Divided into six chambers, this high-capacity silo allows for the simultaneous storage and dispatch of multiple asphalt types, supporting a wide range of production requirements. The system includes two dedicated truck lanes for the main silo, optimizing loading efficiency and minimizing downtime during high-demand periods.

In addition to the main silo, the facility features a direct load silo specifically designed for mastic asphalt. This setup ensures fast and reliable loading of specialized asphalt mixtures, making the plant highly versatile and well-suited to niche or demanding applications such as bridge decks and city street refurbishments.

Fuel flexibility is another key feature of the Hof plant’s operation. The burners are primarily powered by lignite powder—a cost-effective and regionally available energy source. Light oil serves as a secondary fuel, and the system is fully prepared for conversion to natural gas as well as liquid gas (LPG). This multi-fuel capability enhances both environmental adaptability and supply resilience in fluctuating energy markets.

Flexibility and Customisation

Versatility is another key strength of the Hof plant. It boasts three dedicated lines for the addition of solid additives, one of which is specifically configured for rubber granulate. This flexibility enables the production of customized asphalt mixes tailored to a variety of construction requirements, further emphasizing the plant’s commitment to innovation and sustainability.

Smart Operations with as1 Control System

Behind the scenes, the entire operation is orchestrated by the Ammann as1 control system—regarded as the most sophisticated plant control solutions on the market. This intelligent system ensures seamless operation, precise dosing, and consistent quality across every batch of asphalt produced.

The Hof plant also benefits from advanced software modules such as:

  • as1 EcoView, which provides real-time monitoring of energy and emissions data, enabling operators to continuously optimize environmental performance.
  • as1 Dynamic RAP Addition, a module that automatically adjusts the feed of reclaimed asphalt based on real-time plant conditions and mix specifications, enhancing both flexibility and precision when using recycled materials.
  • as1 Solar Module, the latest innovation, designed to manage and optimize energy derived from the plant’s solar panels. It allows the system to dynamically decide whether to consume solar energy immediately or store it for later use, maximizing energy efficiency and contributing further to the plant’s sustainability goals.

A Model for the Future

With its Hof facility, the amo/Debus Gruppe is not just producing asphalt—it is setting new standards for sustainability, technological innovation, and operational excellence in the construction industry. Through advanced recycling technologies, integrated logistics infrastructure, multi-fuel systems, and intelligent automation, the plant embodies a forward-thinking approach that positions it as a model for the future of sustainable infrastructure.

Content produced in association with Ammann Group

For more information on companies in this article

Related Content

  • Premium output from Ammann’s HRT Asphalt Plant
    March 31, 2025

    The High Recycling Technology (HRT) Asphalt Batch Plant is a premium Ammann plant, with advanced technologies. It can incorporate up to 100% RAP with extremely low energy consumption and emissions.

    The double-drum system combines a virgin aggregate drum with either an RAH60 or RAH100 recycling drum. Indirect, gentle heating reduces fuel burn and emissions. Heat distribution is more homogenous, too, which prevents sticking – as does the vertical flow.

  • EC530E and EC550E – the 50-ton excavators with ideas above their size class
    October 1, 2021
    All-new machines are also a new size class for Volvo CE, offering a 25% boost in fuel efficiency and a range of advanced features to also deliver a 20% boost in productivity
  • Efficient processing of RAP in the mix
    December 19, 2017
    There are important methods aimed at the reuse and recycling of reclaimed asphalt pavement (RAP) a number of problems have to be solved however, mainly concerning the elimination of moisture content and how best to heat the RAP without damaging the binder. When RAP is used in percentages of up to 30-40% of the final mix, heating can be carried out through direct contact with hot aggregates. On the other hand, in order to use higher RAP percentages, up to 100%, the plant has to be fitted with a specific h
  • Italian highway link completed
    January 24, 2017
    A challenging road construction project is being carried out in Italy within a tight timeframe, with assistance from a new Marini asphalt plant. The project is for the Salerno-Reggio Calabria highway and the work has to be completed before the end of 2016. Local contractor Bulfaro is carryiing out the work to complete surfacing work to the Macrolotto 3.2; a 40km section of the highway between Laino Borgo and Campotenese. This section of the route is at an altitude of over 800m but the work was complicated b