Skip to main content

Indiana Jones, on a bike

A plucky Canadian cyclist underwent a terrifying experience that emulated a famous scene in an Indiana Jones film. The cyclist was riding his bicycle when an articulated truck pulled out in front of him, causing him to lose control and slide underneath the vehicle. As the truck moved away, he was terrified of being run over by the rear axles so grabbed hold of a brake line and was then dragged for around 500m at speeds of up to 50km/h before another driver was able to alert the truck driver. Although he suf
January 19, 2016 Read time: 1 min
A plucky Canadian cyclist underwent a terrifying experience that emulated a famous scene in an Indiana Jones film. The cyclist was riding his bicycle when an articulated truck pulled out in front of him, causing him to lose control and slide underneath the vehicle. As the truck moved away, he was terrified of being run over by the rear axles so grabbed hold of a brake line and was then dragged for around 500m at speeds of up to 50km/h before another driver was able to alert the truck driver. Although he suffered cuts and bruises as well as broken ribs, the cyclist was not seriously injured and recovered from the incident.

Related Content

  • Earthmoving developments for construction machines
    August 14, 2017
    Excavators, wheeled loaders and ADTs have all seen improvements for this year. New developments in earthmoving machines continue to help improve working efficiency for contractors. The excavator market is the largest single segment of the construction machine sector, with competition being tough between the major players, and a steady stream of new models coming to market. Doosan has launched the new Stage IV compliant DX225LC-5 crawler excavator, which is said to offer high performance, fuel efficiency, r
  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy
  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra