Skip to main content

Improved paving quality

A project in the US has benefited from the use of a material feeder, helping to maximise quality. The work was carried out by contractor Cobleskill Stone Products.
May 24, 2023 Read time: 2 mins
A material feeder from Dynapac has played an important role on a road paving job in the US

The firm was able to deliver high-speed working while ensuring the asphalt paving work was carried out to optimum standards with the use of a Dynapac MF2500CS mobile feeder.

Cobleskill Stone Products is an aggregate producer, material supplier and construction services provider for upstate New York. The firm carries out a large number of asphalt paving jobs in the state and recently used the Dynapac MF2500CS mobile feeder to help pave two rehabilitated stretches of I-88. One of the sections was located near to Schenevus and the other close to Central Bridge.

“The Central Bridge project included three lifts of blacktop to put down T&L, a binder course and a top course,” explained Michael Moore, vice president of Cobleskill Stone Products.

“The job specs only required using a material transfer vehicle (MTV) for the binder and top course, but we chose to use one for all three courses,” added Dan Mark, the project superintendent on the Central Bridge project. “Using an MTV like the Dynapac MF2500 provides better rideability because there are no truck transitions, and we’re able to lay more tonnage at a constant speed.”

“We looked at multiple brands before choosing the Dynapac MF2500,” said Moore. “Using a tracked machine opposed to a wheeled machine had specific appeal because we were working with crack and seal material. Once we established the carrying capacity met the job specs, we looked at the remix capabilities built into the machine and the oscillating conveyor, and it was clear the machine fit the bill for how we wanted to approach the project.”

At the I-88 Schenevus project, Cobleskill Stone Products’ operators typically laid 5.2m of asphalt/minute, which allowed them to complete echelon paving with two pavers running side-by-side for a portion of the project.

Cobleskill Stone Products was supplied the machine by Anderson Equipment Company for the I-88 project.

For more information on companies in this article

Related Content

  • New concrete surface for Arizona freeway
    November 15, 2013
    In Tucson, Arizona, contractor McNeil brothers is using a two-track GOMACO concrete slipformer on a 3.2km stretch of highway. This project is for the Arizona Department of Transportation (ADOT) and involves widening Interstate 10 to four lanes of traffic in each direction between Ruthrauff Road and Prince Road in Tucson. This new stretch was needed to better handle increasing traffic demands in the city and includes rebuilt entrance and exit ramps to improve access to the city.
  • New innovations for crushing and screening equipment market
    September 16, 2015
    Mobile crushing and screening solutions have become a key component for the aggregate production sector - Mike Woof writes. The market for mobile crushing and screening solutions has grown enormously in recent years. With the first track-mounted mobile units having appeared in the 1980s and pioneered by a small number of manufacturers, the range and variety of units on the market has grown enormously since.
  • Prized recycling
    June 13, 2012
    Wirtgen has won the US Cold Recycling Award 2012 for applying its cold recycling structural road rehabilitation technology on Interstate I-81 in eastern America. The I-81 is one of the major north-south routes running across Virginia state with two lanes in each direction. Increasing traffic volumes and the loads imposed by heavy-vehicle traffic were said by the Virginia Department of Transportation (VDOT) to have left the pavement surface covered with alligator cracks, wheel ruts and patches where minor re
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.