Skip to main content

Improved paving quality

A project in the US has benefited from the use of a material feeder, helping to maximise quality. The work was carried out by contractor Cobleskill Stone Products.
May 24, 2023 Read time: 2 mins
A material feeder from Dynapac has played an important role on a road paving job in the US

The firm was able to deliver high-speed working while ensuring the asphalt paving work was carried out to optimum standards with the use of a Dynapac MF2500CS mobile feeder.

Cobleskill Stone Products is an aggregate producer, material supplier and construction services provider for upstate New York. The firm carries out a large number of asphalt paving jobs in the state and recently used the Dynapac MF2500CS mobile feeder to help pave two rehabilitated stretches of I-88. One of the sections was located near to Schenevus and the other close to Central Bridge.

“The Central Bridge project included three lifts of blacktop to put down T&L, a binder course and a top course,” explained Michael Moore, vice president of Cobleskill Stone Products.

“The job specs only required using a material transfer vehicle (MTV) for the binder and top course, but we chose to use one for all three courses,” added Dan Mark, the project superintendent on the Central Bridge project. “Using an MTV like the Dynapac MF2500 provides better rideability because there are no truck transitions, and we’re able to lay more tonnage at a constant speed.”

“We looked at multiple brands before choosing the Dynapac MF2500,” said Moore. “Using a tracked machine opposed to a wheeled machine had specific appeal because we were working with crack and seal material. Once we established the carrying capacity met the job specs, we looked at the remix capabilities built into the machine and the oscillating conveyor, and it was clear the machine fit the bill for how we wanted to approach the project.”

At the I-88 Schenevus project, Cobleskill Stone Products’ operators typically laid 5.2m of asphalt/minute, which allowed them to complete echelon paving with two pavers running side-by-side for a portion of the project.

Cobleskill Stone Products was supplied the machine by Anderson Equipment Company for the I-88 project.

For more information on companies in this article

Related Content

  • Oklahoma highway surface upgrade
    February 2, 2017
    A milling and paving project has provided a necessary surface upgrade for a busy stretch of highway in Oklahoma US Route 62 is an important route and runs 3,597km from the Mexico-US border at El Paso, Texas, to Niagara Falls, New York, on the Canada–US border. A 12km section of the road where it runs through in Oklahoma recently received a rehab. The Oklahoma Department of Transportation (ODOT) project started in Blanchard, Oklahoma, and headed west. This stretch was built in 2000 when ODOT was switc
  • Maputo Airport runway rebuild
    March 26, 2019
    Rebuilding work has been carried out on the runway and taxiways at Maputo International Airport in Mozambique. The work was carried out for Aeroportos de Moçambique, with the engineering handled by NACO and US$64 million of funding being suplied by Agence Française de Dévelopement.
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very