Skip to main content

Hyundai unveils new heavy excavators

Hyundai Heavy Industries Europe (HHIE) is unveiling the company’s new crawler excavator range. For the HX220 L, HX260 L, HX300 L, HX330 andHX380 L models, the engineers at Hyundai have utilised the Tier4/ Stage IV emission requirement to re-develop the machines from scratch.
February 6, 2015 Read time: 2 mins
The new HX300L crawler excavator is one of six new crawler excavators from Hyundai

236 Hyundai Heavy Industries Europe (HHIE) is unveiling the company’s new crawler excavator range.

For the HX220 L, HX260 L, HX300 L, HX330 andHX380 L models, the engineers at Hyundai have utilised the Tier4/ Stage IV emission requirement to re-develop the machines from scratch. The South Korean-headquartered firm says that many improvements from operator feedback have been implemented to create ultimately better, stronger and more robust machines for customers worldwide.

Hyundai has opted for a combined Tier 4/Stage IV standard solution of EGR and SCR technologies. Concurrently, a reduction in fuel consumption of 3-6% is also said have been achieved. The HX220 to HX380 crawler excavators are equipped with new 196 Cummins engines.

With the new engine technology the side vent holes have increased in size for a better airflow towards the engine.

The cabin of the six new excavator models has been redesigned: not just the front window but also the door, which is now easier to open from the inside with an extra handrail. These finishing touches on the inside of the cab are said to ensure greater comfort for the operator. The interior of the cabin has been re-arranged to provide 10% more space for the operator and better air circulation with the newly developed air-conditioning system.

Inside the cabin there is also a new and bigger monitor. Easier to read, full colour and with more functions including centralised switches for a number of applications. Connection with a mobile phone is now easier than ever as well as connections with outside cameras for an all-round view.

For more information on companies in this article

Related Content

  • LiuGong’s 856H wheeled loader showcased for first time in Europe
    January 6, 2017
    LiuGong’s 856H wheeled loader with “new LiuGong DNA” is being showcased at INTERMAT 2015 for the first time in Europe in Tier 4 Final/Stage IV configuration. “The H-Series [wheeled loaders] has been completely designed to work efficiently, and to be easy to service and maintain,” said David Beatenbough, LiuGong’s vice president. “This is the first machine to display our new LiuGong DNA. Over the coming months and years you’ll see machines with the same visual cues as the 856H.”
  • LiuGong’s 856H wheeled loader showcased for first time in Europe
    April 24, 2015
    LiuGong’s 856H wheeled loader with “new LiuGong DNA” is being showcased at INTERMAT 2015 for the first time in Europe in Tier 4 Final/Stage IV configuration. “The H-Series [wheeled loaders] has been completely designed to work efficiently, and to be easy to service and maintain,” said David Beatenbough, LiuGong’s vice president. “This is the first machine to display our new LiuGong DNA. Over the coming months and years you’ll see machines with the same visual cues as the 856H.”
  • Asphalt paving design advances
    June 15, 2012
    A diverse array of advanced paver designs is now being offered in the asphalt paving sector – Mike Woof reports With the World of Asphalt and INTERMAT 2012 events having both taken place in recent months, a series of innovations have been introduced for the asphalt paving market. Developments have come to market that widen the array of both US and European asphalt paving systems and all the major manufacturers have developed new pavers and materials feeders to meet the latest emissions requirements. Demand
  • Improving performance for Hyundai
    April 12, 2016
    Hyundai has seen strong sales in Europe 2015 and expects the growth trend to continue in 2016. Alain Worp, sales director for construction equipment at HHIE, says the company is also investing €30 million in building a new headquarters in Belgium, with its warehouse alone covering 13,000m2. “This project is expected to be finished by the end of 2016. It will be almost four times as big as the present facility,” he said.