Skip to main content

Hot cars

The owner of a new Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim.
January 21, 2014 Read time: 1 min
The owner of a new 6337 Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim. One of the construction workers had noticed the damage and left a note on the car for the owner, with repairs being paid for by the builder. The building’s developers have vowed to provide a layer over the glass that will reduce the reflection and address the problem.

For more information on companies in this article

Related Content

  • Waste-full paving in Australia
    November 18, 2022
    The use of waste materials in roads, including higher proportions of RAP, is gaining ground.
  • Asphalt plants: alternative fuels on the horizon
    November 22, 2022
    Many asphalt plant manufacturers such as Ammann, Benninghoven and Fayat have already developed contingencies for alternative fuels.
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Developments in minimising construction defects
    February 27, 2012
    Egis has an innovative approach to addressing construction defects - *Martin O’Flaherty, Jean Pohu. Defects often become apparent after construction projects are handed over to the client and this is a common problem across most highway projects. The problem is shared by highway operators who have assumed the responsibility of managing such projects.