Skip to main content

Hot cars

The owner of a new Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim.
January 21, 2014 Read time: 1 min
The owner of a new 6337 Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim. One of the construction workers had noticed the damage and left a note on the car for the owner, with repairs being paid for by the builder. The building’s developers have vowed to provide a layer over the glass that will reduce the reflection and address the problem.

For more information on companies in this article

Related Content

  • Testing high performance road markings
    February 9, 2012
    High performance markings are among the safety products used to guide traffic safely, but they must be tested and checked. Patrick Smith reports. Road construction zones, zebra crossings, tunnels and areas with frequent fog are particular focal points with regard to road user safety. This is why manufacturers, authorities and contractors are always eager to use innovative road markings and special studs or, where necessary, lane control devices to assist both drivers and pedestrians in all conditions, parti
  • Tram time
    November 20, 2014
    A driver of a compact Nissan car gave passengers waiting for a tram in the UK town of Oldham something of a surprise. Instead of the tram they expected to see, the small Nissan car drew to a halt in front of the stop.
  • Controlling influence
    January 3, 2013
    New lane control solutions from major roadmarking companies have been installed on highways across the world over recent months. Guy Woodford reports on some of them. Clearview Traffic Group (CTG) recently clocked up the installation of over 70,000 Astucia active flush and surface mounted road studs in the UK. CTG has been involved in numerous road stud installation projects on motorways and other road types in the UK and many other countries worldwide. Its UK installations include over 4,500 Astucia road s
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public