Skip to main content

Hot cars

The owner of a new Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim.
January 21, 2014 Read time: 1 min
The owner of a new 6337 Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim. One of the construction workers had noticed the damage and left a note on the car for the owner, with repairs being paid for by the builder. The building’s developers have vowed to provide a layer over the glass that will reduce the reflection and address the problem.

For more information on companies in this article

Related Content

  • New Moscow bus terminal
    June 25, 2018
    Construction work for a new bus terminal in Moscow is benefiting from the assistance of eight items of construction equipment from Liebherr. In all, the project is using seven crawler cranes and a piling ring that have been supplied by Liebherr for the work. This urban construction project is for an ultra-modern bus terminal, which will feature a capacity of 15,000 passengers/day. Approximately 1,600 bus services are expected/day and at peak times the facility will handle 1,000 passengers/hour. The new bus
  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Buying bitumen: do you know enough?
    December 2, 2014
    Changes to the way bitumen is produced and traded mean that traditional ways of specifying – and buying - it may not be enough - Frank Albrecht, MD of Albr3cht Supply Concepts, explained why to Kristina Smith Traditionally, we have specified bitumen using two values: the penetration (pen) and ring and ball figures which define the hardness of the bitumen and its softening point respectively. Taking that approach today is risky, warns Frank Albrecht, managing director of Albr3cht Supply Concepts. “It’s not