Skip to main content

Hot cars

The owner of a new Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim.
January 21, 2014 Read time: 1 min
The owner of a new 6337 Jaguar car had an unwelcome surprise when he returned to where the vehicle had been parked on a hot day in UK capital London. He had left the car in a street close to where a new building is being constructed, which features large areas of glass in its design. Unfortunately the reflected light from the building’s glass areas was concentrated on the car, proving sufficiently hot to melt some of the plastic trim. One of the construction workers had noticed the damage and left a note on the car for the owner, with repairs being paid for by the builder. The building’s developers have vowed to provide a layer over the glass that will reduce the reflection and address the problem.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Dual layer, hot to hot paving at German airport
    August 18, 2015
    An airport in Germany has seen the use of very innovative asphalt paving techniques, with the use of dual-layer, hot-to-hot working. The method was used to meet a very tight schedule for the runway rebuilding work, while also delivering the high quality required. Two InLine Pave trains from Vögele were used at Rostock-Laage Airport to lay a new surface and binder course. The operation was innovative as the process used both hot-to-hot, echelon paving as well as dual layer, hot-on-hot working. Using this
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Kraton expands duty range of its polymer products
    August 23, 2013
    The pavement industry needs to come up with novel solutions in order to meet the twin challenges of climate change and squeezed budgets. This was the message from Kraton Polymers market development manager Rombout Hartemink when he addressed FIRM13. Hartemink illustrated the properties of Kraton’s modified bitumen with the aid of his stretchy bar. This 250mm-long bar of Highly Modified Bitumen stretches to five or six times its length, returning to its original state in around five minutes. “It changes