Skip to main content

Hot car

A classic Lamborghini Miura SV sports car recently caught fire in London, while it was being driven. The owner managed to escape unharmed but by the time emergency services were able to attend the fire, the car had been completely burned out. As this extremely rare car is worth around £1 million, the insurance company is not likely to be happy about having to make a payout. The reason for the fire is unknown but the electrics of this 1971 model were never a strongpoint. Aerodynamically the Miura is also rep
August 15, 2013 Read time: 2 mins
A classic 3066 Lamborghini Miura SV sports car recently caught fire in London, while it was being driven. The owner managed to escape unharmed but by the time emergency services were able to attend the fire, the car had been completely burned out. As this extremely rare car is worth around £1 million, the insurance company is not likely to be happy about having to make a payout. The reason for the fire is unknown but the electrics of this 1971 model were never a strongpoint. Aerodynamically the Miura is also reputed to have its flaws by generating lift rather than downforce at speed. As the front-mounted fuel tank empties the car is said to have a somewhat unnerving tendency to lift its front wheels from the ground. Given that the improved later (and most sought after) SV model had a top speed of 276km/h (171mph), this was something of a deterrent to driving a Miura flat out. The rarity and value of this particular model, with only 150 made and few surviving thanks to the car’s peculiar aerodynamics and stunning power to weight ratio, means that the car is likely to be rebuilt from the ground up.

For more information on companies in this article

Related Content

  • Road safety move for young drivers
    April 11, 2024
    A new road safety focus for young drivers will save lives
  • Smart road test facility in Virginia
    July 28, 2015
    A test stretch of road in the US is playing a valuable role in developing technology and boosting traffic safety -*Tom Gibson writes Located a short distance from the Virginia Tech campus in the mountains of rural southwest Virginia in the mid-Atlantic region of United States, the Virginia Smart Road looks like a conventional road. But venturing to either end of the 3.5km-long thoroughfare reveals that it actually goes nowhere, at least for now. The result of a plan conceived back in the 1980s, the Vi
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen