Skip to main content

Holiday traffic jams

In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
October 3, 2018 Read time: 3 mins
In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result.


Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in northern Italy (including the stretches in Austria and Switzerland) for example are notorious for jams and delays as Germans head south on holiday, and then later on, when they return.

However, even the worst highway jams in Europe are minor in comparison to those that can occur on China’s network at key public holiday periods.

Highways can cope well with large volumes of traffic but there does come a point when capacity is reached. And in queueing traffic, a moment’s inattention on the part of one driver can result in nose to tail impacts. Similarly, vehicles may overheat in traffic jams. And where ‘smart motorways’ are in use with no emergency lanes/shoulders, it means that damaged or defective vehicles cannot move out of the way and will continue to block active lanes, resulting in further hold-ups.

There has been considerable research into the behaviour of vehicles in queueing traffic. Rather than vehicles trundling along at a steady (albeit slow) speed, wave effects are common with vehicles speeding up and slowing down. The problem can be reduced if drivers maintain a distance from the vehicle in front, although in practice this may not be workable. Leaving such a space typically incites drivers of other vehicles to jump lanes in an attempt to make better progress.

It is worth noting too that the summer months may be peak times for road construction works. So the risks to road personnel and drivers may be heightened due to the combination of having many work zones on the highway and heavy traffic volumes.

There are some solutions. It is worth noting that in most instances, peak period traffic jams will be in one direction only. Procedures used in some US states for emergency evacuation by road allow for traffic to use both carriageways. These have been used in states such as Florida for hurricane evacuation procedures, with only limited (emergency) traffic heading back towards the danger zone. While such extreme measures are only likely to be necessary in emergency situations, there are systems that allow the number of lanes to be increased in a particular direction, should this be required. Movable barriers provide a physical separation and mean that traffic can be switched over to the opposite carriageway, while still ensuring vehicle safety overall.

Related Content

  • Road user charging, the way to highway investment?
    April 12, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports Our road systems and how we use them have changed dramatically over the last few centuries, and yet some problems persist and others reappear. For most of human history roads have been used by foot traffic and by cumbersome wagons hauled at walking pace. Roads were built to provide some obvious advantage in commerce or conquest. They were then grudgingly maintained by those who might gain some advantage from the
  • Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway
    August 1, 2013
    A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • Rebuilding roads in Italy
    February 16, 2024
    A fleet of Liebherr ADTs is helping with the construction of a major project at Lake Reschen in Northern Italy, close to the country’s borders with Austria and Switzerland.