Skip to main content

Holiday traffic jams

In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
October 3, 2018 Read time: 3 mins
In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result.


Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in northern Italy (including the stretches in Austria and Switzerland) for example are notorious for jams and delays as Germans head south on holiday, and then later on, when they return.

However, even the worst highway jams in Europe are minor in comparison to those that can occur on China’s network at key public holiday periods.

Highways can cope well with large volumes of traffic but there does come a point when capacity is reached. And in queueing traffic, a moment’s inattention on the part of one driver can result in nose to tail impacts. Similarly, vehicles may overheat in traffic jams. And where ‘smart motorways’ are in use with no emergency lanes/shoulders, it means that damaged or defective vehicles cannot move out of the way and will continue to block active lanes, resulting in further hold-ups.

There has been considerable research into the behaviour of vehicles in queueing traffic. Rather than vehicles trundling along at a steady (albeit slow) speed, wave effects are common with vehicles speeding up and slowing down. The problem can be reduced if drivers maintain a distance from the vehicle in front, although in practice this may not be workable. Leaving such a space typically incites drivers of other vehicles to jump lanes in an attempt to make better progress.

It is worth noting too that the summer months may be peak times for road construction works. So the risks to road personnel and drivers may be heightened due to the combination of having many work zones on the highway and heavy traffic volumes.

There are some solutions. It is worth noting that in most instances, peak period traffic jams will be in one direction only. Procedures used in some US states for emergency evacuation by road allow for traffic to use both carriageways. These have been used in states such as Florida for hurricane evacuation procedures, with only limited (emergency) traffic heading back towards the danger zone. While such extreme measures are only likely to be necessary in emergency situations, there are systems that allow the number of lanes to be increased in a particular direction, should this be required. Movable barriers provide a physical separation and mean that traffic can be switched over to the opposite carriageway, while still ensuring vehicle safety overall.

Related Content

  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Free flow tolling technology is booming
    April 10, 2013
    Jon Masters reports on the latest moves in the free-flow tolling segment. Free-flow tolling of roads and discrete infrastructure, such as bridges and tunnels, is an area of transportation that appears to be booming. Tolling in general is on the up, often still as a means for funding road projects where public sector budgets can no longer cover the necessary costs, but not exclusively so. Several high profile examples of road user charging for ‘demand management’ – the reduction of congestion as part of a wi