Skip to main content

Hitachi ZX135US-5 and ZX210LC-5 excavators work in Sjodalen valley

Norwegian contractor Skogen has started building a service road for a log-cabin development in Norway’s Sjodalen valley. More than 90 of the 120m2 cabins are being constructed to order and the project is scheduled to be completed within the next 12 months. The Vågå-based company was set up in 1982 by owner Ola Skogen and is firmly focused on general construction activities including groundworks and roads, as well as foundations, drainage and utilities for log cabins. The contractor’s medium excavat
July 7, 2016 Read time: 3 mins
Hitachi logs time in Sjodalen valley
Norwegian contractor Skogen has started building a service road for a log-cabin development in Norway’s Sjodalen valley.

More than 90 of the 120m2 cabins are being constructed to order and the project is scheduled to be completed within the next 12 months.

The Vågå-based company was set up in 1982 by owner Ola Skogen and is firmly focused on general construction activities including groundworks and roads, as well as foundations, drainage and utilities for log cabins.

The contractor’s medium excavator fleet is now 100% 233 Hitachi from which the company deployed a ZX135US-5 and ZX210LC-5 to start work at the scenic location. Sjodalen is a wide, gently sloping valley in southern Norway and in which flows the river Sjoa from the deep mountain lake Gjende.

Skogen’s strategy is to use relatively new machinery. So after each model reaches between  6,000-7,000 working hours it is updated from the authorised Hitachi construction machinery dealer in Norway, Nasta. “This is especially the case for the latest generation of Zaxis excavators,” said Ola Skogen. “which has comparatively low fuel consumption and overall running costs.”

The company’s Zaxis excavators are supplied with HELP - Hitachi Extended Life Programme - extended warranty and service contracts. With a duration of five years/8,000 hours, this level of cover allows the contractor to plan ahead with fixed costs and well maintained equipment.

Rune Morten Ryen has been working as an operator with Skogen for 15 years. “The ZX135US-5 is so versatile,” he explained of his previous machine. “You can use it wherever you want, even in gardens and between buildings. The cab is spacious and well equipped for our needs. It’s easy to turn and manoeuvre, plus the short-tail swing is hugely beneficial in confined spaces.”

He has recently been allocated to the ZX210LC-5. “It is very stable, powerful and offers more capacity. This is the machine’s first job and it’s been useful to test it with different attachments, such as the hammer, which is only required occasionally to break up rock. The monitor is also useful for checking information and the rear-view camera is ideal.

“The two machines are working well together and they have proved to be a strong combination for this job. They can operate in restricted areas and there is enough power when we need it.”

For more information on companies in this article

Related Content

  • Capital move by Turkish Hitachi dealer
    July 31, 2012
    ENKA Pazarlama, one of the longest-serving distributors of Hitachi Constriction Machinery (Europe)/HCME, has opened a new branch in Turkey's capital city, Ankara. ENKA Pazarlama has been serving the Turkish market with Hitachi excavators, wheel loaders and crawler cranes since 1981. The new 12,000m² development is the latest addition to the Turkish dealer's branch network, which includes a number of regional offices, service centres and sub-dealers. Founded in 1972 ENKA Pazarlama is a sub-division of the la
  • Wirtgen W 210i: A good grip on the TT Circuit Assen
    October 16, 2015
    The 4.5km TT circuit in Assen, Netherlands, is one of Europe’s iconic motorcycle race tracks built specifically for championship two-wheel races. But years of hard and fast racing had created undulations 3-8 mm high along the start and finishing stretches. Drivers had to brake before turns. Even so, their machines would judder and threaten to be uncontrollable. It was therefore necessary to profile the raceway over an area of 3,000m² to restore the surface’s skid resistance. Enter GMS Fahrbahnsanierun
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w